Laserfiche WebLink
3 DAM FIELD PROCESS AREA 3 DAM SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br />TO SDP <br />COLLECTION CHAMBER <br />0 <br />SP PAHH <br />- - TB3-10 (+24 VDC) 5606 PC PAH <br />3 T84 F 1/0 MODULE 713 <br />3 B P4 <br />PR C -------NOB-1 <br />713 - ----- --f-- If T04.7 -_I <br />TO NEXT SP <br />TERMINAL BLOCK 5209 <br />CONTROLLER <br />COM3 <br />SP RS 232 <br />SOURCE WATER 5209 <br />FROM 3 DAM CONTROLLER P7 <br />VERTICAL TURBINE <br />PUMPS RJ45 RJ45 <br />I <br />z to <br />w w <br />t7i <br />El El <br />ETHERNET/FIBER ETHERNET/]FIBER <br />SWITCH SWITCH <br />RJ45 RJ45 <br />FIBER OPTIC <br />TX SC SC RX <br />FIBER OPTIC <br />RX SC SC TX <br />0 ISSUED FOR CONSTRUCTION M 168/31/06 <br />NOTES: NO REVISIONS BY OATS <br />PRESSURE :SOURCE WATER FROM 3 DAM VERTICAL TURBINE PUMPS © CLIMAX MOLYBDENUM <br />D PROVIDED BY 3 DAM PUMP STATION CONTRACTOR <br />SET POINT : NONE ASubsidiary of Phelps Dodge Corporabon <br />SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH HIGH (PAHH) :240 PSI 3 DAM PUMP STATION <br />ALARM HIGH (PAH) :225 PSI CONTROL LOOP 113 <br />ALARM LOW : NONE 05018-D-07 PIPING & INSTRUMENTATION DIAGRAM INCORPORATED <br />DRAWING N0. DRAWING TITLE <br />ALARM LOW LOW :NONE REFERENCE DRAWINGS CKD. K. G.McCas <br />THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE PM: J HARVEY DRAWING REV. <br />INTERLOCK (PAHH) : TURN OFF 3 DAM VERTICAL TURBINE PUMPS. (P-141 & P142) LEWIS 06/12/061081 506..0730 <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF <br />05018_I_$$ 0 <br />CONTROLS :NONE THE LYNTEK AND PROPER NO WRITTEN REPRODUCTION CAN AUTHORIZATION BE OF MADE LYNTEK. OUT SCALE CUEW (D) NONE