My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 DAM FIELD PROCESS AREA I 3 DAM MOTOR CONTROL CENTER 1 3 DAM SCADA CONTROL PANEL ISDP SCADA CONTROL PANELS SDP SCADA COMPUTER <br />D <br />LR + --- <br />NNNNNNNNNNNN <br />Z 706 _ <br />Z <br />z I-------- <br />I HAND OFF AUTO F- - <br />Z D X00 <br />Z HS <br />-0 0- <br />0OX <br />-CL_LO- - - - <br />Z X00 <br />Z <br />D <br />2 <br />2 <br />Z <br />? I - - HS- <br />Z I 1078 <br />INTERLOCK <br />t I D OVERRIDE <br />2 I KEYSWITCH <br />Z I HS NORMAL OVERRIDE <br />7098 <br />INTERLOCK F- XO <br />OVERRIDE <br />2 I KE <br />YSWI CH 1 <br />? I NORMAL OVERRIDE 1 <br />F X0 <br />z 1 L------------ <br />DID--- <br />HS ~ X00 <br />- I 709 L? o --- <br />3DAM SOURCE WATER <br />TO SDP <br />PUMP SUMP M M # COLLECTION <br />CHAMBER <br />D23 D <br />VERTICAL VERTICAL <br />TURBINE TURBINE <br />PUMP PUMP <br /> <br />LEVEL 3 DAM PUMP SUMP <br />SET POINT : 8.0 FEET <br />ALARM HIGH HIGH HIGH (LAHHH) : 15.0 FEET <br />ALARM HIGH HIGH (LAHH) : 13.0 FEET <br />ALARM HIGH (MAIN LAH): 8.5 FEET, (LEAD LAH): 9.0 FEET, (LAG LAH): 10.0 FEET <br />ALARM LOW (LAL) : MAIN LAL• 7.0 FEET, LEAD LAL• 7.5 FEET. LAG LAL: 7.7 FEET <br />ALARM LOW LOW (LAU-) : 6.5 FEET <br />ALARM LOW LOW LOW (LALLL) : 6.0 FEET <br />- - - - - - - - - - - - - - - <br />------------------ <br />------ --- -------- <br />-- - - - - - - - - - - - - - - <br /> <br /> VSD <br />D <br />14 <br />P--14 <br />1 <br />-----? 1 I - <br />--- 20 ?r----- i i t- <br />--- 22 1 I <br />X <br />I <br /> 11 11 <br />I <br />I III <br /> 12 II III <br /> 13 <br /> 24 --- Ii----? I I I <br /> 25 <br /> 26 ++- J I 1 ? ?- <br />1 27 <br />II 1-- <br /> <br /> <br />L--?I-- 480 VAC <br />--- <br />? <br /> <br />L----- 3PHASE <br />-- <br />? <br />I 1 r <br />----- 117 -? <br />T--- <br />------ <br />------ -- <br />-- ---- 1 rtT+T--- <br />--- T tr?F--- <br />------ -- ---tT+j--- <br />I <br />I <br /> <br />------ <br />-- I <br />I <br />---111 <br />------ --- ---J I I <br /> D SOFT <br />3 I L_ - - - <br /> START L <br />TB1 <br />P-142 r <br />1 r--- <br /> <br />L <br />?? - 480 VAC <br />3 PHASE <br />NOTES <br />1. ALL DIMENSIONS FOR ALARMS, <br />INTERLOCKS & SET POINTS ARE <br />FROM THE BOTTOM OF THE TANK <br /> <br />INTERLOCK (LALL) : VERTICAL TURBINE PUMP #I (P-141) TURNS OFF AT LALL. <br />CONTROLS : VERTICAL TURBINE PUMP #1 (P-141) SPEED MODULATES TO MAINTAIN THE SELECTED LEVEL. <br />VERTICAL TURBINE PUMP #2 (P-142) TURNS OFF AT LAL <br />F-TB3-10 (+24 VDC) Sp <br />5606 <br />TB4 I 1/0 MODULE <br />ANALOG INPUTS <br />- B PP44 <br />>cf C O - - 0 I AIOB-0 <br />L ?I T04.6 LJ <br />SP <br />TO NEXT 5209 <br />TERMINAL BLOCK CONTROLLER <br />P10 <br />AOOA-0 <br />TB6 r ]GND <br />H C? D - - L ?TB6-i <br />SP <br />TO NEXT 5209 <br />TERMINAL BLOCK CONTROLLER <br />P7 <br />(120 VAC) TB1-F3- 1 SP <br />5606 <br />T1132 I 1/0 BOARD <br />F11 1A P7 <br /> 0 - - s 0 DI0-0 <br /> 1 <br />- - 1 - - <br />- 1 DI0-1 <br />F37 1A <br /> j <br />F- 2 DI0-2 <br /> - <br /> 3 -_?s 3 DI0-3 <br />F15 1A P9 <br />- - 17 - - ?- 17 DIO-17 <br />PF16 1A <br />? ] D10- 18 i <br />-- 18 m -- w <br />SP <br />5606 <br />1/O D <br />Ts7 P <br />F21 1A - 0 Doe-0 <br />- - 0 - - 1 D00-1 <br />F22 to LF <br />- - 1 - - ?T81-7 (NEUTRAL) <br />tz <br />t <br />z <br />K <br />LAHH <br />LAH <br />LAL <br />LALL <br />SP <br />5209 <br />CONTROLLER <br />COM3 <br />RS-232 <br />k145 <br />P7 <br />E1 <br />ETHERNET/FIBER <br />SWITCH <br />E1 <br />ETHERNET/FIBER <br />SWITCH <br />RJ45 <br />FIBER OPTIC <br />TX SC <br />FIBER OPTIC <br />RX SC <br />D PROVIDED BY 3 DAM PUMP STATION CONTRACTOR <br />RX <br />TX <br />THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />O <br />© CLIMAX MOLYBDENUM <br />A Subsidiary of Phelps Dodge Corporation <br />SLUDGE MANAGEMENT PROJECT <br />3 DAM PUMP STATION <br />LOOP 706 <br />IkIA INCORPORATED <br />:IN. P KG.cCash MLEWIS 1064124 06 120607.0940 <br />05018-1-871 2
The URL can be used to link to this page
Your browser does not support the video tag.