My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SDP FIELD PROCESS AREA SDP MOTOR CONTROL CENTER SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br /> C6 <br /> 5406A <br /> AIR WATER <br />DIGITAL OUTPUTS <br /> CLARIFlER D <br />1 <br /> r-211 <br />: <br />TB6 <br /> OPEN <br />s ---- <br />Ir - - - - - - - - - <br />--------------- <br />r-- 0 12 D06-12 <br />--- <br />? <br /> S CLOSE F49 1A NO <br /> 4 - - - - - - - - - -- - - - - - - <br />FCV DI - - - - - - - - - - - - - - - - - - - 'oh <br />Z F50 1A o <br />13 D06-13 <br /> 512 120 _ OPEN _ _ _ _ <br />VAC <br />5 NO <br /> <br />S <br />CLOSE <br />P 1A --- N014 DO6-14 <br /> 4 <br />--------------- <br />> ------------ 0 <br /> 29 <br />1 - - +G F <br />52 to 15 006-15 <br />? <br /> 514 VAC - - NO <br /> OPEN - <br />- - - - - - - - - - - - - - <br />L <br />- - - - - - - - - - - - - - <br />- - - - F53 to C7 <br /> 3 I CLOSE - --- ----------- <br />C4 -------------- ---- F54 1A ,II DIGITAL OUTPUTS <br /> A0 III ?- OM 0 007-0 <br /> SEE LOOP 522 <br />FOR VALVE WIRING I? NO <br /> <br /> 1 007-1 <br /> FCV NO <br />O <br /> JIC <br /> 515 328 <br /> ® I I <br /> -TB1-CB4 (120 VAC) <br /> M <br />I <br /> SEE LOOP 527 NORMAL LOADS 209 <br /> SLUDGE FOR PUMP WIRING I I CONTROLLER <br /> RECYCLE <br />M <br />INCOMING POWER COM3 <br /> PUMP #2 F I RS-232 <br /> SLUDGE RJ45 <br />TB2 <br /> P-222 <br />RECYCLE I <br /> PUMP #1 EMERGENCY JS COIJ - - - - - - - F17 1A - - - TB1-F3 (120 VAC) <br />I <br /> P-221 NC LOADS 328 NO - ?- - - - - - m 44 - - <br />CS 5404 <br /> M T <br /> <br />OPEN SDP <br />AUTOMATIC L_ -POWER FROM <br />EMERGENCY I I DIGITAL INPUTS <br /> <br />- - 12 DI5-12 <br /> SEE LOOP 522 SLUDGE C7 TRANSFER <br />, <br /> FOR PUMP WIRING WASTE M S CLOSE <br />cs - SWITCH GENERATOR <br /> PUMP #2 I T06 <br /> P-224 SLUDGE FCV I 120 I F43 1A I C6 <br /> WASTE 32 VAC D ----.---------- --- m <br />I <br /> <br />PUMP #1 <br />L -------------- <br />- - - <br />DIGITAL OUTPUTS <br />mF44 1A <br /> P-223 I <br /> ? <br />I <br />O 6 D06-6 <br /> _ N <br /> Cl OPEN L --0 NO 7 D06-7 <br />-I -? - - <br /> TO SLUDGE S C6 CLOSE --- --------------- -- I TB6 r o <br /> <br />8 DO6-8 <br />1 <br /> DISPOSAL BEDS <br />F45 toe - <br />L+G <br /> FCV 120 2 <br />D = CO <br />L <br /> 3288 VAC F46 1A - - <br />9 D06-9 <br /> NO <br /> ALKALIZATION I <br /> TANK I <br /> - - TB1-CB3 (120 VAC) <br /> T-231 2 AS BUILT Kll 12/10/07 <br /> 1 REVISED VALVE WIRING O.C. 1 04/13/07 <br />DP AUTOMATIC TRANSFER SWITCH <br />P <br />WER ISSUED FOR <br />CONSTRUCTION <br />08/31/06 <br />: S <br />O <br />NOTES NOTES NO REVISIONS <br />: BY DATE <br />SET POINT :NONE 1. ALL DIMENSIONS FOR ALARMS, <br />INTERLOCKS & SET POINTS ARE <br />D VENDOR SUPPLIED <br />© CLIMAX MOLYBDENUM <br />ALARM RICH HIGH : NONE FROM THE BOTTOM OF THE TANK ASuhsdiary of Phelps Dodge Corporation <br /> SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH : NONE Z POWER WIRING FOR BIFFI VALVE ACTUATORS: <br />SLUDGE DENSIFICATION <br />120 VAC HOT - TERMINAL L1 PLANT <br />ALARM LOW : NONE 120 VAC NEUTRAL - TERMINALS L2 & C2 <br />GROUND - GROUND TERMINAL 05018-D-05 PIPING & INSTRUMENTATION DIAGRAM CONTROL LOOP 328 <br />NONE <br />ALARM LOW LOW 05018-D-03 PIPING & INSTRUMENTATION DIAGRAM <br />: <br />D POWER WIRING FOR KEYSTONE VALVE ACTUATORS: <br />DRAWING NO. <br />DRAWING TITLE r? ? INCORPORATED <br />INTERLOCK : NONE 120 VAC HOT - TERMINAL 2 REFERENCE DRAWINGS C AD-0 G.McCash 08 08 O6 <br /> CKD K <br />LEWIS 08 <br />08 1 2007 <br />I <br />1600 <br />120 VAC NEUTRAL - TERMINAL 1 & 3 THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE . . <br />1 / <br />/22. _ <br />. <br />CONTROLS : START AUTOMATIC STANDBY SEQUENCE WHEN AUTOMATIC TRANSFER SWITCH IS ACTIVATED. GROUND - GROUND TERMINAL INFORMATION CONTAINED THEREIN IS THE PROPERTY OF P•M• J. HARVEY DRAWING NO. REV. <br /> LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT C uENf <br /> THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. s cue: (D)NONE 05018-1-6O 2
The URL can be used to link to this page
Your browser does not support the video tag.