Laserfiche WebLink
SDP MOTOR CONTROL CENTER SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br /> ID <br /> 327 <br /> 480 VAC <br /> 3 PHASE <br /> I SP <br /> 5209 <br /> CONTROLLER SP <br /> COM1 5209 <br /> <br /> <br />SDP <br />OT RS-485 <br />--------- A <br />A CONTROLLER <br />COM3 <br />RS-232 <br /> POWER B - - - - - - - - - - -------- B RJ45 <br /> MONITOR 327 <br /> GND GND <br /> I <br /> 480 VAC <br /> 3 PHASE <br />i <br /> <br />1 REVISED RS-485 WIRING O.C. 04 13 07 , <br /> 0 ISSUED FOR CONSTRUCTION Mc 08 31 06 <br /> <br />NO REVISIONS <br />BY DATE <br />VOLTAGE :SDP POWER MONITOR © <br />CLIMAX MOLYBDENUM <br />SET POINT : NONE ASuhsidiary of PhelpsDodge Corporagoo <br /> SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH HIGH : NONE <br /> SLUDGE DENSIFICATION PLANT <br />ALARM HIGH :NONE CONTROL LOOP 327 <br />ALARM LOW : NONE <br />05018-D-03 PIPING do INSTRUMENTATION DIAGRAM <br />J?/K INCORP <br /> <br />DRAWING N0. DRAWING TITLE ORATED <br />ALARM LOW LOW : NONE REFERENCE DRAWINGS CAD G.McCash Oa/07/06 A Z <br />15 4q <br />041 <br />7 <br />INTERLOCK : NONE THIS DRAWING WAS PREPARED BY LYNTEK. ALL OF THE I <br />.,10 <br />. <br />CND. K. LEWIS 08/07/06L <br /> INFORMATION CONTAINED THERON IS THE PROPERTY OF P•N• J. HARVEY DRAWING NO. REV. <br />CONTROLS :NONE O? <br />E P CUEW <br />05018-1-59 1 <br /> ROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />TH ALE: (D) NONE <br />SC <br />