Laserfiche WebLink
TR-103 Reclamation Liability Information: <br />New Roads <br />Description Footage <br />East A Pit Extensions <br />1,320 <br />West Z Pit Road 1,300 <br />Total 2,620 <br />Total footage added 2,620 <br />cyds @ 16.67 cyds/ft 43,675 <br />Cost per cyd (CIRCES Task 204) $0.229 <br />Cost to regrade new roads $40,002 <br />New Pits <br />Pit Pit length <br />K pit 2,900 <br />Cost per foot $152 from task 107 ($627,699/4,125 lineal feet) <br />Cost to regrade pits $440,800