Laserfiche WebLink
Appendix A <br />TR-103 Reclamation Liability I nformation: . <br />Summary <br />Topsoil replacement $87,297 <br />Revegetation $22,864 <br />Regrade Roads $10,002 <br />Regrade Pits $440,800 <br />Subtotal $560,963 <br />Indirect Cost $139,568 at 24.88% <br />Total $700,530 <br />Topsoil ReplacemenURemoval <br />Topsoil changes by pit <br /> Acres Acres <br />Pit Replacement Removal Net Change <br /> <br />East Ashmore Pit 43.3 21.6 21.7 <br />K Pit 0 73.9 -73.9 <br />Z Pit 19.5 3.6 15.9 <br /> <br />Total 62.8 99.1 -36.3 <br />Cubic yards of liability added: <br />acres 38.3 <br />depth (ft) 1 <br />swell 12.50% <br />cyds 65,885 <br />cost/cyd (from CIRCES task 181) 1.325 <br />Topsoil Cost $87,297 <br />Revegetation <br />acres added 36.3 <br />cost per acre (CIRCES task 119) $629.87 <br />Rsvegalabon cost $22,864