Laserfiche WebLink
Lorencito Canyon Mine C-1996-084 <br />Permit Renewal A? <br />PROJECT IDENTIFICATION <br />Date : 23-Apr-08 Permit C-96-084 Site: Lorencito Canyon Mine <br />User: JRS State : Colorado <br /> Filename: C084-000 County: Las Animas <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal 02 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />041 -Replace Topsoil from Upslope Area to W-4 1.91 $792 <br />042 -Replace Live-Handled Topsoil to W-6 1.72 $712 <br />043 -Replace Topsoil from Upslope Area to W-6 0.85 $355 <br />044 -Replace Topsoil from Stockpile BA#3 to W-6 1.20 $1,476 <br />045 -Replace Live-Handled Topsoil to N-2 12.84 $5,330 <br />046 -Replace Topsoil from Upslope Area to N-2 12.79 $5,310 <br />047 -Replace Live-Handled Topsoil to S-3 1.09 $453 <br />048 -Replace Topsoil from Upslope Area to S-3 0.59 $243 <br />049 -Replace Topsoil from Stockpile BA#3 to S-3 0.70 $840 <br />050 -Replace Topsoil from Stockpile SSP#2 to N-1 4.17 $1,729 <br />051 -Replace Live-Handled Topsoil to E-2 0.92 $382 <br />052 -Replace Topsoil from Upslope Area to E-2 0.92 $380 <br />053 -Replace Live-Handled Topsoil to E-3 1.83 $761 <br />054 -Replace Topsoil from Stockpile BA#3 to E-3 1.30 $1,547 <br />055 -Replace Topsoil from Upslope Area to BA#1 1.61 $667 <br />056 -Replace Topsoil from Upslope Area to BA#2 1.92 $796 <br />057 -Replace Topsoil from Upslope Area to BA#3 4.31 $1,790 <br />058 -Replace Topsoil from Loadout Stockpile to Loadout Area Removed - TR-14 $0 <br />059 -Remove Topsoil from Knob Above Cut 31.35 $13,012 <br /> <br />065 -Plug and Seal 30 Drill Holes and Monitoring Wells 180.00 $67,983 <br /> <br />070 -Hydroseed Jeff Canyon Haul Road Steep Embankments Released - SL-02 $0 <br />071 -Broadcast Seed Jeff Canyon Topsoil Piles Released - SL-02 $0 <br />072 -Broadcast Seed Loadout Removed - TR-14 $0 <br />073 -Broadcast Seed Mine Site 168.00 $130,214 <br />074 -Hydroseed Steep Slopes at Mine Site 36.00 $48,017 <br />075 -Fertilize Mine Site During Year 2 84.00 $8,485 <br />076 -Fertilize Mine Site During Year 3 84.00 $8,485 <br />077 -Broadcast Seed Borrow Area 3 5.40 $4,185 <br />078 -Direct Shrub Seeding 9.00 $4,409 <br />jrs Page 2 4/28/2008