Laserfiche WebLink
Lorencito Canyon Mine C-1996-084 <br />PROJECT IDENTIFICATION <br />Date : 23-Apr-08 Permit C-96-084 Site: Lorencito Canyon Mine <br />User: JRS State : Colorado <br /> Filename: C084-000 County: Las Animas <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal 02 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />001 -Push Spoil Into Hollow Fill Released - SL-01 $0 <br />002 -Load and Haul Spoil from Fill 8 to Jeff Canyon Mine Released - SL-01 $0 <br />003 -Spread Spoil at Jeff Canyon Mine Released - SL-01 $0 <br />004 -Load and Haul Bed Coal Released - SL-02 $0 <br /> <br />008 -Rip Jeff Canyon Topsoil Stockpile Base Released - SL-02 $0 <br /> <br />012 -Grade Jeff Canyon Mine Released - SL-01 $0 <br />013 -Grade Jeff Canyon Topsoil Stockpile Area Released - SL-01 $0 <br />014 -Grade Borrow Area 1 Released - SL-01 $0 <br />015 -Grade Borrow Area 2 Released - SL-01 $0 <br />016 -Grade Borrow Area 3 2.08 $241 <br /> <br />020 -Regrade Ditches at Loadout Released - SL-02 $0 <br /> <br />025 -Replace Topsoil from Stockpile BA#1 to Fill 7a 4.98 $5,297 <br />026 -Replace Topsoil from Stockpile SSP#2 to Fill 9a 7.42 $7,880 <br />027 -Replace Topsoil from Stockpile SSP#3 to Fill 8 13.20 $14,032 <br />028 -Replace Topsoil from Stockpile SSP#2 to N-1 8.28 $8,732 <br />029 -Replace Topsoil from Stockpile BA#2 to C-1 12.93 $13,585 <br />030 -Replace Topsoil from Stockpile BA#I to C-2 8.10 $8,550 <br />031 -Replace Topsoil from Stockpile BA#2 to S-2 2.06 $2,479 <br />032 -Replace Topsoil from Stockpile BA#3 to S-4 3.43 $4,181 <br />033 -Replace Topsoil from Stockpile BA#2 to W-2 10.91 $13,322 <br />034 -Replace Topsoil from Stockpile BA#3 to W-3 3.02 $3,181 <br />035 -Replace Topsoil from Stockpile BA#3 to W-5 11.07 $13,520 <br />036 -Replace Topsoil from SA Stockpile to Service Area 0.23 $96 <br />037 -Replace Topsoil from Haul Road Stockpile to Service Area Released - SL-02 $0 <br />038 -Replace Live-Handled Topsoil to W- I 4.82 $2,000 <br />039 -Replace Topsoil from Upslope Area to W-1 4.80 $1,992 <br />040 -Replace Live-Handled Topsoil to W-4 1.92 $795 <br />jrs Page 1 4/28/2008