Laserfiche WebLink
• <br />C Factor SO% Canopy <br />• <br />• <br />1.2 <br />1 <br />0.8 <br />0 <br />0.6 <br />LL <br />V <br />0.4 <br />0.2 <br />0 <br />0 10 20 30 40 50 60 70 80 90 <br />Percent Ground Cover <br />Figure 3 - "C" Factor vs % Ground Cover for 50% Canopy <br />Practice Factor "P" <br />This factor is only applicable when such practices such as contouring perpendicular to the <br />slope or other similar practices are used. None of these items are applicable to the pre- <br />mining case and are excluded in post-mine to keep the calculations conservative. Therefore, <br />the "P" factor for both the pre-mine and post-mine cases is 1.0. This is true for all <br />reclaimed areas at the New Horizon #2 Mine. <br />100 <br />25 <br />