Laserfiche WebLink
4. Erosion from the topsoil stockpile will be prevented through the use of silt fence on the downgradient <br />side. <br />5. At this time Denison does not plan to place any additional topsoil on the pile as no new areas of <br />disturbance with corresponding salvage of topsoil, at the West Sunday are currently identified to obtain <br />topsoil from. <br />6. Denison proposes to place 6 inches of topsoil on the top of the waste rock area per the attached <br />reclamation map. Given the 824.4 cubic yards of topsoil, the topsoil at a depth of 6 inches will cover <br />the area shown on the map (approx. 1.02 acres). <br />Please contact me if you have any questions or concerns (303) 389.4136. <br />Sincerely, <br />DENISON MINES (USA) CORP. <br />~i~ ~.d <br />Christy Woodward, P.E. <br />Environmental Engineer <br />CC: Denison File <br />Terry Wetz, Denison Mines (USA) Corp. <br />2 <br />dENISON~-._~ <br />MINES <br />