My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-13_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-05-13_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:32 PM
Creation date
5/13/2008 9:00:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
5/13/2008
Doc Name
New Technical Revision
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR14
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pattern per 5 ft of tunnel. Bolts will be installed to completely cover the tunnel from 2 ft below grade <br />line to 2 ft below grade line on opposite rib, unless otherwise specified by Climax. <br />B. Grouted cable bolts will be required in zones of poor quality rock or areas of excessive roof fall. <br />Climax will provide a bolt pattern for cables. Mats will be required where ground conditions warrant. <br />Wire mats are 4-inch by 4-inch opening, 4 gauge wire in sheets that are 4 ft wide by 8 ft long. <br />2.1.5 Installation of Concrete and Shotcrete <br />A. Installation of Shotcrete and/or concrete will be required in areas of the tunnel, as indicated by Climax, <br />where sloping or spalling of the back or ribs has been or is anticipated to be severe based on the <br />ground conditions. It is anticipated that following washing and mucking activities, Climax will inspect <br />the area and determine the specific ground support requirements. Climax will issue to the Contractor <br />"Rock Support Instructions" for the notification to proceed with the work. <br />B. A wet system of application installing a nominal 4 inches of reinforced Shotcrete will be placed in two <br />separate lifts is required by Climax. If the area of application is too wet, a dry system of application <br />will be considered. <br />Additional figures illustrating TMT rehabilitation details are provided below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.