Laserfiche WebLink
• ~ • • <br />CC&V TANK VISUAL INSPECTION AND INTEGRITY TESTING (Pa4e 2 of 21 <br />Tank No. Tank /Container Volume Contents of Tank or <br />or Container Material Tank Units Container Visual Inspection Integrity Testing' Location or Comment <br />Tanks and Containers at the Fuel Farm <br />FF-1 Large Cylindrical Steel Tank 100,000 gal Diesel Fuel Monthly Every 5 Years -Start 2010 White Tank Located on West End of Fuel Farm <br /> Mounted Vertically (this is the newer diesel tank) <br />FF-2 Large Cylindrical Steel Tank 100,000 gal Diesel Fuel Monthly Every 5 Years - Start 2"010 White Tank Located in the Middle of Fuel Farm <br /> Mounted Vertically (this is the older diesel tank) <br />FF-3 Large Cylindrical Steel Tank 13,000 gal Unleaded Gasoline Monthly Every 5 Years -Start 2010 White Tank Located on East End of Fuel Farm <br /> Mounted Vertically <br />FF-4 Rectangular Totes, Steel or 1,400 gal Diesel Additives Monthly Every 5 Years -Start 2010 Located on top of the Main Containment Berm <br />'- Plastic (4 C~3 350 gal) on the West End of the Fuel Farm <br />FF-5 Cylindrical Steel Tank 1,000 gal On-Road Diesel Fuel Monthly Every 5 Years -Start 2010 Located in the Northwest Corner of Fuel Farm <br /> Mounted Horizontally <br />FF-6 Cylindrical Steel Tank 1,000 gal Kerosene Monthly Every 5 Years -Start 2010 Located in the Northeast Corner of Fuel Farm <br /> Mounted Horizontally <br />FF-7 Cylindrical Steel Tank 500 gal Motor Oil 15W40 Monthly Every 5 Years -Start 2010 Located on the North Side of the Main <br /> Mounted Vertically Containment Berm (FF-7 =White Tank) <br />FF-8 Cylindrical Steel Tank 500 gal Antifreeze Monthly Every 5 Years -Start 2010 Located on the North Side of the Main <br /> Mounted Vertically Containment Berm (FF8 =Gray Tank) <br />FF-9 Cylindrical Steel Tank 500 gal Hydraulic Oil Monthly Every 5 Years -Start 2010 Located on the North Side of the Main <br /> Mounted Vertically Containment Berm (FF9 =Gray Tank) <br />Adsorption Desorption Recovery Plant Generators <br />ADRG-1 Steel Rectangular Belly Tanks 9,000 gal Diesel Fuel Monthly It is impractical to test these tanks due to the location of the generator units <br /> Generator Units (3 ~ 4,500) and the fact they rest directly on the ground. The visual inspections <br />ADRG-2 Steel Rectangular Belly Tank 1,200 gal Diesel Fuel Monthly combined with adequate containment provide" equivalent environmental <br /> Generator Units (1 C~ 1,500) protecction" in the opinion of the certifying engineer. <br />'40 CFR Part 112.7(d) requires that for buck storage containers, periodic integrity testing of containers and leak testing of valves and piping must be conducted. Steel Tank Institute <br /> SP001-03 <br />Inspection of Shop, Fabricated ASTs will serve as the reference method for testing. American Petroleum Institute 653 may also be used for tanks and API Standard 570 may be used for piping. <br /> . <br />Appropriiate integrity testing may be done by a CC&V employee providing the employee has received training by the company that manufactures the device used to conduct the testing. For <br /> example, <br />if the CC&V employee uses a model "25DL plus" by Olympus to conduct ultrasonic tests, then he/she must verify in writing that he/she has completed a training course by Olympus or has <br />been instructed by a competent instructor in the proper use of the equipment. This written record of training must be kept with the current SPCC plan. Previous training and experience <br /> can <br />suffice if the employee documents use of the equipment and signs a statement that he/she is competent~n the use of the device in question. This record must be kept with the current SPCC <br /> plan. <br />It is the opinion of the certifying engineer that this procedure of allowing-a qualified CC&V employee to_conduct the testing is_ "equivalent env_ironment_al protection" under_the. SP_CC.regulations. <br />at.-- -. -- - ---- <br />40 CFR Part 112. Prepared by Michael D. Ellis, P.E. 4-7-03, revised 12-5-07 <br />Tank Inspection September 25, 2006 <br />EMS: AGANA/CCV Printed Copies are Uncontrolled Doc. # E-006 <br />S:\4010-00055 CC & V 112(d) Permit Application\ERP, SPCC, FMPWPP-J-Tank Testing-5-06 Revision 03 <br />