Laserfiche WebLink
• • <br />2008 CRIPPLE CREEK and VICTOR ~LD DEM <br />OLITION COST ESTIMATE <br />Building or Structure No. Length Width Height Cu.Ft. $/Cu.Ft.' Cost <br />Primary Crushers ! 1 78.0 48.0 112.0 419,328 1 $0.23 I $96,445 <br />Crane above pocket ? 1 85.0 33.0 50.0 140,250 i $0.23 ! $32,258 <br />Secondary Crusher MCC j 1 53.0 21.0 15.0 ~ 16,695 I $0.23 j $3,840 <br />Secondary Crushers_ <br />~ ! 1 <br />~---}- <br />-- 120.0 67.0 107.0 ! 860,280 $0.23 $197,864 <br />Screen Bldg <br />_ r <br />1 72.0 32.0 86.0 ! 198,144 + $0.23 i $45,573 <br />Screen MCC's ~ 1 40.0 18.0 15.0 ~ 10,800 $0.23 r $2,484 <br />Loadout Bin 1 1 21.85 36.0 I 13,492 ! $0.23 ! $3,103 <br />Lime Silo _ __ _ 1 84.0 21.5 ! 119,088 , $0.23 i $27,390 <br /> <br />Conveyor <br />_ <br />Length <br />~ <br />$/Lin Ft s _ _ <br /> <br />Screen Feed <br />~ 1 <br />~ <br />587.0 ~_ <br />_ <br />~ _ <br />__ ~ <br />$16.17 ! _ <br />$9,492 <br />Crushed Ore __ ~ 1 1,243.0 ' __ __ - ~ $16.17 $20,099 <br />Second Crusher Feeder I 1 843.0 ~ _ $16.17 + $13,631 <br /> <br />Shuttle <br />2 <br />111.0 ~ <br />~ <br />$16.17 r _ <br />$3,590 <br />Screen Undersize _ ___--___ __ i 1 620.0 ___~ $16.17 ~ $10,025 <br />Screen Oversize _ ~~1 555.0 + ~ $16.17 ~ $8,974 <br />Product to LOB (load-out bin) __ 1 1 586.0 ! ~ $16.17 ~ $9,476 <br />LOB Relocation Phase IV (2008 __ 1 2,050.0 ' `__ $16.17 ~ $33,149 <br /> <br /> <br />_ Cresson Plant _~ <br />SUBTOTAL _ <br />$517,394 <br /> <br />Crusher Maint. Bldg. _ _ <br />~ 1 <br />- <br />40.0 <br />40.0 <br />17.0 ; _ <br />27,200 ,, <br />$0:24 r <br />$6,528 <br />Security Bldg. __ ~ 1 65.0 40.0 10.0 26,000 ~ $0.23 ~ $5,980 <br />MCC Building for Phase II Pumps - - i 1 21.0 11.0 12.0 _ 2,772 ~ $0.23 ~ $638 <br />------------ -__------- -------- -- - - -- SUBTOTAL __ <br />$13,146 <br /> <br />Laboratory <br />Laboratory Building 1 1 _ ____ 150.0 68.7 52.4 539,982 ! $ 0.24 ' $129,596 <br />' 2008 Means Heavy Construction Cost Data, pg. 33. Steel Structures @$0.23 /cf & "mixed" Total Page _1___=_ $647,113 <br />steel w/ concrete structures @ $0.24/cf T <br />2Pro-rated cost for conveyor demolition based on historic costs and Means. ~ -__ mde 2_&oa Rev (4-3-OS) <br />