My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (368)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (368)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:21:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 11 Reclamation Cost Model to Support MLEP
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • • <br />Reclamation of Buildina Footprint Areas (paae 2 <br />Activity Units Work Hours Eqmt Cost Labor Cost Material Cost Total Cost Verifications /Checks <br /> <br />6Rip 8 Fertilize (ac) 65.5 38.53 $ 1,575 $ 1,254 $ 8,122 $ 10,951 $ 167.19 $!ac <br /> D4 Rate (ac/hr) 1.7 <br />'Seed & Harrow (ac) 59.0 25.63 $ 1,134 $ 834 $ 6,190 $ 8,158 $ 138.38 $/ac <br /> D4 Rate (ac/hr) 2.3 <br />BHand Seed (ac) 6.6 6.55 N/A $ 136 $ 688 $ 824 $ 125.80 $!ac <br /> Rate (ac/hr) 1.0 <br />9Hydro-Mulching (ac) 65.5 109.17 $ 3,239 $ 3,154 $ 34,253 $ 40,647 $ 620.56 $/ac <br /> Rate (aGhr) 0.6 <br />10Plant Trees (ac) 65.5 97.76 N/A $ 2,033 $ 30,261 $ 32,294 $ 493.04 $/ac <br /> Rate (ac/hr) 0.67 <br />Total Work Hours = r 886.00 <br />"Supervisor (work hrs/4) - 221.50 $ 3,023 $ 9,447 included $ 12,470 <br />Reclamation of Building Footprint Areas = $ 120,736 $ 36,047 $ 79,783 $ 236,565 $ 3,612 $/ac <br />'Assumes grading will be done with conventional D9 dozer <br />s Truck Fleet (773's) will haul fill to fill in ponds and complete the recontouring effort <br />3Growth Medium Replacement will be done with a 623 scraper fleet <br />°Growth Medium will be spread using a D-9 dozer to a depth of 6 inches <br />SSoil analyses will be run on samples of the reclaimed areas to determine optimum fertilizer rates <br />6Ripping and fertilizing will be conducted on the replaced growth medium using a conventional D4 dozer with a cyclone spreader <br />Seeding and harrowing will be conducted on all replaced growth medium that is traversible with conventional equipment <br />eAssumes minimal amount of the area will require hand-seeding to achieve revegetation <br />9Mulching will be conducted using conventional hydro-seeder/hydro-mulcher <br />10Trees and shrubs will be planted on north and east-facing slopes <br />"Supervisor costs are figured at 25 percent of the total work hours to accomplish the reclamation effort <br />MDE (3-3-08) <br />
The URL can be used to link to this page
Your browser does not support the video tag.