My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:52:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 2 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER _ ANI Y W[)RK <br />PROJECT IDENTIFICATION <br />Ownership cost/hour : $110.37 NA Weight (UST) : 59.08 <br />Operating cost/houc : $177.86 100 Cost data source : (CRG) <br />Operator cost/houc : $24.95 NA <br />Total unit cosUhour : $313.18 Total fleet cost/hour : $626.35 <br /> <br />MATERIAL ::: ,<.A:•;:.;:.; <br />QU NTITIE <br />S <br />Initial Swell Loose <br />volume : 1,000 CCY factor : 1.125 volume : 1,125 LCY <br /> <br />Source of quantity take-off :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PR:::D ::::::................................................ <br />O UCTION ............................... ............................................................ .................................... ........................... <br />Hauling Caaacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth -Dry packed Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds <br />Payload capacity : 29.41 LCY Adjusted capacity : 29.00 LCY *** <br /> <br />Cvcle Time (load + haul + spread + return) : Loading time : 1.00 minutes <br /> Maneuver and spreading time : 0.60 minutes <br />Travel time : • l oading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 800 4.0 5.0 9.0 1,042 0.81 minutes ** <br />Return : 800 -4.0 5.0 1.0 2,963 0.27 minutes ** <br />"travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resi stance shown, not average Total cycle time 2.68 minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 6,300 Adiusted Hourlv Production <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 1,297.23 LCY/Hour*** <br />Job efficiency factor : 0.83 (1 shiff/day) Adjusted unit production : 1,076.70 LCY/Hour <br /> Adjusted fleet production : 1,076.70 LCY/Hour <br />Net job correction factor : 0.83 "' 2 times volume on push-pull models <br />JOB TIME AND COST' :::::.............. ................................................... ................................................................ .............................. ............ <br />.................... <br />Fleet size : 2 Scraper(s) Total job time : 1.04 Hours <br />Unit cost : $0.582 /LCY Total job cost : $654 <br />
The URL can be used to link to this page
Your browser does not support the video tag.