Laserfiche WebLink
CIRCES Cost Estimating Software <br />Sf:ROPFR _ ANI V WARK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 126 State :Colorado Permit/job # : C-1981-022 <br />Date : 05/06/2008 County :Delta Abbreviation :none <br />User : JRS Site :Elk Creek Mine Filename : C022-126 <br />Permit or other job action :Permit Renewa105 <br />Task description :Replace Topsoil from <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Model :Cat 637G w/push-null <br />to 11-West Refuse Pile <br />Job utilization <br />Shift basis : 1 per day <br />Horsepower 740 <br />Ownership cosUhour : $110.37 NA Weight (UST) : 59.08 <br />Operating cost/hour : $177.86 100 Cost data source : (CRG) <br />Operator cosUhour : $24.95 NA <br />Total unit cost/hour : $313.18 Total fleet cost/hour : $626.35 <br /> <br />MATERIAL :::UANTITIE;;;;; :................................... <br />Q S ............................... ........................................................... .................................... ............................ <br />Initial Swell Loose <br />volume : 4,650 CCY factor : 1.125 volume : 5,231 LCY <br />Source of quantity take-off : Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />............................. <br />HOURLY PRODUCTION::::• ................................. <br />............................... <br />............................... <br />........................................................... <br />........................................................... <br />.................................... <br />.................................... <br />............................ <br />............................ <br />Hauling Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth -Dry packed Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds <br />Payload capacity : 29.41 LCY Adjusted capacity : 29.00 LCY *** <br />Cycle Time (load + haul + spread + return) : Loading time : 1.00 minutes * <br /> Maneuver and spreading time : 0.60 minutes <br />Travel time : • loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 750 10.0 5.0 15.0 589 1.28 minutes " <br />Return : 750 -10.0 5.0 -5.0 2,972 0.32 minutes ** <br />"travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 3.21 minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 6,300 Adiusted Hourly Production ; <br />Altitude adjustment factor : 1.00 (Cat Ii8) Unadjusted unit production : 1,085.40 LCY/Hour*** <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 900.88 LCY/Hour <br /> Adjusted fleet production : 900,$$ LCY/Hour <br />Net job correction factor : 0.83 •'• 2 times volume on push-pull models <br /> <br />.............. <br />JOB TIME AND COST :::::.............. <br />.................................................. <br />................................................... <br />.................................................................. <br />................................................................. <br />............................ <br />............................. <br />........................... <br />................................ <br />Fleet size : 2 Scraper(s) Total job time : 5.81 Hours <br />Unit cost : $0.695 /LCY <br />I <br />1 Total job cost : $3,637 <br />