My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:52:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 2 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE .E;;.:UIPMENT::;::: .:........................................................................................................................................................................ <br />............................................. <br />Q <br />sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $56.94 1 $56.94 $56.94 <br />-Fuel Tanker, 6x4, 210 HP $75.07 1 $75.07 $75.07 <br />-Cube Truck, 6x4, 210 HP $90.35 1 $90.35 $90.35 <br />-Flatbed Truck, 6x4, 45K GVW $119.56 1 $119.56 $119.56 <br />-Light Duty Pickup, 4x4, 1 T. Crew $73.53 1 $73.53 $73.53 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $415.44 $415.44 <br />...................................................................................................................................................................................................... <br />E::::UIPMENT HAUL DI:::TANC:::::::.n ::::::............................................................................................................................................................ <br />.......................................... <br />Q S E a d TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Grand Junction <br />Equipment Equipment <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />2.00 2.00 <br />2.00 2.00 <br />0.50 NA <br />0.50 NA <br />5.00 4.00 <br />Total non-roadable mob/demob cost <br />"two round trips with haul rig <br />Total roadable mob/demob cost ** <br />"one round trip, no haul rig <br />JOB TIME AND COST <br />Total job time <br />Total iob cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.