Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 095 State :Colorado Permit/job # : C-1981-022 <br />Date :05/08/2008 County :Delta Abbreviation :none <br />User : JRS Site :Elk Creek Mine Filename : C022-095 <br />sheet 1 of 2 <br />Permit or other job action :Permit Renewa105 <br />Task description :Mobilize/Demobilize Equipment for Initial Reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-CAT 815E 22.97 $37.70 $88.67 1 $126.37 $88.67 $250.00 <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 3 $563.41 $376.35 $750.00 <br />-ATLAS COPCO ROC D7-1 12.25 $51.82 $88.67 1 $140.49 $88.67 $250.00 <br />-Cat 330C L 37.18 $45.61 $117.55 1 $163.16 $117.55 $250.00 <br />-CAT 14H 20.70 $39.50 $88.67 1 $128.17 $88.67 $250.00 <br />-Cat 637G w/push-pull 59.08 $110.37 $125.45 2 $471.64 $250.90 $500.00 <br />-Reveg Equipment 20.00 $84.00 $88.67 1 $172.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,765.91 $1,099.48 $2,250.00 <br />