My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 8-May-08 Permit C-1981-022 Site: Elk Creek Mine <br />User: JRS State :Colorado <br /> Filename: C022-OOf County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal OS <br /> Drainage Control System Installation and Removal Tasks -Tasks 045-060 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />045 Reconstruct/Riprap Lower Hubbard Creek 6.69 $27,390 <br />046 Excavate for Lower Hubbard Creek Riprap Placement 12.80 $1,787 <br />047 Reconstruct/Riprap Bear Canyon 3.61 $14,784 <br />048 Excavate for Bear Creek Riprap Placement 1.90 $265 <br />049 Reconstruct/Riprap Elk Creek 60.32 $246,840 <br />050 Excavate for Elk Creek Riprap Placement 278.58 $38,898 <br />051 Remove Upper Hubbard Creek Sediment Pond 3.89 $806 <br />052 Remove East Bench Pond 0.79 $164 <br />053 ~ ExcavateBackfill Pond C Wall Area 2.33 $325 <br />054 Regrade West Valley Fill Diversion 2.53 $353 <br />055 Remove Sanborn Creek Ditches (CD-1, 2, 3, 4, 5 and CD-A) 1.90 $393 <br />056 Remove Sewage Leach Field 0.84 $174 <br />057 Regrade Pond A 0.79 $164 <br />058 Regrade Pond B 34.72 $7,205 <br />059 Regrade Pond D 56.92 $11,813 <br />060 Remove Gravel from Substation No. 3 to Sediment Pond 0.59 $366 <br />061 Backfill and Regrade Pond F 3.13 $649 <br />062 Backfill and Regrade Ditches at Hubbard Creek Fan Site 1.09 $226 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 473.42 $352,602 <br />jrs page 6 of 11 5/8/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.