My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 8-May-08 Permit C-1981-022 Site: Elk Creek Mine <br />User: JRS State :Colorado <br /> Filename: C022-OOg County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal OS <br /> Topsoil Replacement Tasks -Tasks 065-074 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />065 Replace Topsoil from Stockpile to Previously Disturbed Elk Creek Area 1.91 $1,197 <br />066 Replace Topsoil from Stockpile to Sanborn Creek Area 13.12 $8,218 <br />067 Replace Topsoil from Stockpile to East Refuse Area 5.19 $3,250 <br />068 Replace Topsoil from Stockpile to West Valley Fill Area 28.63 $17,933 <br />069 Replace Topsoil from Stockpile to Substation No. 3 1.73 $1,078 <br />070 Replace Topsoil from Stockpile to Elk Creek Mine Area 19.37 $12,133 <br />071 Replace Topsoil from Stockpile to CBM-15 Drill Pad 0.36 $224 <br />072 Replace Topsoil from Stockpile to Light-Use Road to CBM-15 0.41 $255 <br />073 Replace Topsoil from Stockpile to Drill Pads from MR-56 and 57 and TR-38 3.65 $2,275 <br />074 Replace Topsoil from Stockpile to Roads from MR-56 and 57 and TR-38 2.38 $1,484 <br />075 Replace Topsoil from Stockpile to Drill Pads from MR-73 and TR-46, 48, 49 and 53 10.69 $6,655 <br />076 Replace Topsoil from Stockpile to Light-Use Roads from MR's and TR's 11.36 $7,070 <br />077 Replace Topsoil from Stockpile to Pond F, Ditches and Plunge Pool 1.45 $904 <br />078 Replace Topsoil from Stockpile to Drill Pads from TR's 54, 56 and 57 5.18 $3,225 <br />079 Replace Topsoil from Stockpile to Light-Use Roads from TR's 54, 56 and 57 8.24 $5,133 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 113.67 $71,034 <br />jrs page 7 of 11 5/8/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.