My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 8-May-08 Permit C-1981-022 Site: Elk Creek Mine <br />User: JRS State :Colorado <br /> Filename: C022-OOa County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal OS <br /> Backfilling and Rough Grading Tasks -Tasks 001-014 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />001 Backfill and Regrade Elk Creek Facilities Area 391.11 $243,508 <br />002 Backfill and Regrade Sanborn Creek Facilities Area 12.16 $7,573 <br />003 Backfill and Regrade Substation No. 3 Pad and Sediment Pond 1.84 $1,148 <br />004 Backfill and Regrade Material Used to Widen Access Road 1.99 $1,237 <br />005 Backfill and Regrade Elk Creek Mine Area 153.00 $95,258 <br />006 Move Fill Material from Elk Creek Mine to Elk Creek Facilities 151.97 $95,184 <br />007 Backfill and Regrade CBM-15 Drill Pad 0.78 $484 <br />008 Backfill and Regrade Primary Riprap Borrow Area 6.43 $4,002 <br />009 Backfill and Regrade Secondary Riprap Borrow Area 16.28 $10,139 <br />010 Backfill and Regrade Elk Creek Mine Rock Safety Catch Bench 31.84 $19,824 <br />011 Regrade Drill Pads Associated with MR-56 and 57 and TR-38 18.07 $11,249 <br />012 Backfill and Regrade Temporary Conveyor Corridor 16.39 $10,206 <br />013 Regrade Drill Pads Associated with MR-73 and TR-46, 48, 49 and 53 28.47 $17,724 <br />014 Regrade Drill Pads Associated with Technical Revisions 54, 56 and 57 9.15 $5,701 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 839.48 $523,237 <br />jrs page 1 of 11 5/8/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.