Laserfiche WebLink
t T^; <br />~~ ``' J <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br /> List of Appendices (Continued) <br /> Appendix Tif/e <br /> C Design Calculations <br /> C.1 Geogrid Calculations <br /> C.2 Geomembrane Tensile Strength and Anchor Trench Calculations <br /> C.3.1 Phases I Through 5 Primary Solution Collection Pipe Burial Calculations <br /> C.3.2 Phase 5 VLF Primary Solution Collection Pipe Burial Calculations <br /> C.4 Primary Solution Collection Pipe Flow Calculations <br /> C.5 Riser Pipe Calculations <br /> C.6.1 VLF Foundation Settlement Calculations <br /> C.6.2 AGOSA Foundation Settlement Calculations <br />• C.7.1 Phase IVa Ore Slope Settlement Calculations <br /> C.7.2 Phase 5 VLF PSSA Embankment Settlement Calculations <br /> C.8 High Volume Solution Collection Piping Calculations <br /> C.9 Underdrain Calculations <br /> D Assessment of Underground Workings within Limits of Phase 5 Valley Leach <br /> Facility <br /> E Phase 5 VLF Slope Stability Results <br /> E.1 Infinite Slope Analysis <br /> E.2 Slope Stability Files <br /> F Surface-Water Hydrology <br /> F.1 Letter to DRMS Pertaining to SCS Runoff Curve Numbers <br /> F.2 Surface Water Hydrology Design <br /> G Water Balance Results <br />S:\PROJECTS\1125 CCBV PHASE 5 VLF\H2 - DESIGNWREQUA VLF\VLF PHASE 5 FINAL REPORT V2.DOC Vlll <br />