Laserfiche WebLink
~~n <br />SMITH WILLIAMS CONSULTANTS, INC., <br /> <br />List of Appendices <br />Appendix Title <br />A Field Investigation Data <br />B Laboratory Testing <br />B.1 Phase 5 VLF Material Property Testing <br />B.2 Golder 2005 Liner Load Testing For TR 45 <br />B.3 Drain Cover Fill Permeability Testing <br />B.4 Cresson Ore Percolation and Consolidation Tests <br />B.5 Ore Shear Strength Test Data <br />• <br />B.5.1 Cresson Ore Shear Strength Test Results (1996) <br />B.6 Interface Shear Strength Testing <br />B.6.1 Phase 5 Interface Shear Strength Testing <br />B.6.2 Phase IV Interface Shear Strength Testing (Originally Submitted as Part of <br />Amendment No. 8) - <br />B.6.3 Interface Shear Strength Testing for Phase I (Ironclad Borrow Area 1993) <br />(Originally Submitted as Part of Amendment Nos. 6 and 7) <br />B.6.4 Interface Shear Strength Testing for Phase II (Borrow Area No. 5 1996a) <br />- - - _ (Originally Submitted as Part of Amendment Nos. 6 and 7) <br />B.6.5 Interface Shear Strength Testing for Phase III (Borrow Area No. 2 1996b) <br />(Originally Submitted as Part of Amendment Nos. 6 and 7) <br />B.6.6 Interface Shear Strength Testing for Borrow Area No. 2 (1996c) (Originally <br />Submitted as Part of Amendment Nos. 6 and 7) <br />B.7 Cresson Ore Data <br />B.7.1 Cresson Ore Draindown Data <br />B.7.2 Cresson Ore Moisture Data <br />• <br />S:\PROJECTS\1125 CCBV PHASE 5 VLF\H2 - DESIGNWREQUA VLF\VLF PHASE 5 FINAL REPORT V2.DOC <br />VIl <br />