My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (256)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (256)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:05 PM
Creation date
5/8/2008 1:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Valley Leach Facility Phase 5 Extension Design
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~1 <br />SMITH WILLIAMS CONSULTANTS, INC. <br />2. Phase II: A 1-foot-thick layer of bentonite amended SLF overlain by an 80-mil <br />single-sided textured LLDPE geomembrane liner, representing the material used as <br />the composite liner for Phase II. Interface direct shear testing was performed by <br />GeoSyntec Consultants of Atlanta, Georgia using four different normal stress values <br />ranging between 50 and 300 psi imposed on a section of bentonite amended SLF <br />overlain by 80-mil textured LLDPE geomembrane overlain in turn by DCF material. <br />The interface testing for these normal loads were used to define a linear relationship <br />(friction angle and cohesion) between the normal loads calculated in the stability <br />section slices, and the corresponding shear strength. The SLF was compacted to 95 <br />percent of the standard Proctor maximum dry density and at optimum moisture <br />content. Test results were presented to the DBMS by CC&V in a July 8, 1996 letter <br />titled "Cresson Project; Permit M-80-244: Bentonite Addition to SLF -Stability <br />Analysis File". A copy of this information was formally transmitted in a July 15, <br />19961etter titled "Test Results for Bentonite Amended Soil Liner Fill." An angle of <br />internal friction of 15 degrees and 1,590-psf cohesion were used in the analysis, <br />corresponding to the residual shear strength measured as part of the interface shear <br />strength testing, which is consistent with that submitted previously to CC&V. The <br />• interface shear strength results are presented in Appendix B of this report. <br />3. Phases III and IV: A 1-foot-thick layer of clay borrow SLF overlain by an 80-mil <br />single-sided textured LLDPE geomembrane liner, representing the material used as <br />the composite liner for Phase III and to be used for Phase IV. Interface direct shear <br />testing was performed by GeoSyntec Consultants of Atlanta; Georgia using various <br />different normal stress values. As part of the clay borrow SLF investigation, interface <br />shear strength testing-was performed for normal loads of 50 psi and 150 psi on two <br />different samples of clay borrow SLF overlain by 100-mil textured HDPE <br />geomembrane overlain in turn by LVSCF. This configuration was tested as it <br />represented the interface between the thickest geomembrane and the smallest <br />gradation of the overlying granular material. The interface testing for these normal <br />- .loads were used to define a linear relationship (friction angle and cohesion) between <br />the normal loads calculated in the stability section slices, and the corresponding shear <br />strength. The SLF was compacted to 95 percent of the standard Proctor maximum <br />dry density at the optimum moisture content. Based on these test results, the interface <br />shear strength that had a friction angle of 18 degrees and a cohesion of 410 psf was <br />considered the critical interface. The interface shear strength test was repeated for <br />• normal loads corresponding to 50 psi, 100 psi, 150 psi, and 300 psi, except that the <br />S:\PROJECTS\1125 CCBV PHASE 5 VLF\H2 - DESIGMAREOUA VLF\VLF PHASE 5 FINAL REPORT V2.DOC 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.