My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (256)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (256)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:05 PM
Creation date
5/8/2008 1:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Valley Leach Facility Phase 5 Extension Design
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMITH WILLIAMS CONSULTANTS, INC. <br />• <br />the Mining and Ore Processing Facilities: Cresson Project, "which was presented as an <br />attachment to Amendment No. 6 to Permit M-1980-244 filed with the Division of Reclamation, <br />Mining, and Safety (DRMS, formerly Office of Mined Land Reclamation but referenced as <br />DRMS throughout this report) (CC&V 1993). In January 1997, Golder developed a design <br />report fora 620,000-square-foot valley leach extension in the area of the former site of the <br />Carlton Mill titled, "Cresson Project, Phase II Heap Leach Pad Expansion Design, "which was <br />submitted by CC&V to the DRMS with a March 20, 1997, letter titled, "Cresson Project; Permit <br />M-1980-244: Technical Revision for Expansion of Phase II of Cresson Project Valley Leach <br />Facility. " In July 1998, Golder developed a design report for Phase III titled, "Cresson Project; <br />Valley Leach Facility Expansion, Phase III Design, "which was presented as Volumes II and III <br />of Amendment No. 7 to Permit M-1980-244 filed with the DRMS (CC&V 1998). In March <br />2000, Golder developed a design report for Phase IV titled, "Cresson Project; Valley Leach <br />Facility Expansion, Phase IV Design, "which was presented as Volumes V, VI, and VII of <br />Amendment No. 8 to Permit M-1980-244 filed with the DRMS (CC&V 2000). <br />Pertinent data used as part of the previous designs, which have been approved by the MLRB and <br />DRMS, have been included as part of the Phase 5 VLF design. <br />• Base topography for the Phase 5 VLF area was based on digital contour maps of the area with a <br />5-foot contour interval and is shown in Drawing A200. Surveying and development of the <br />digital topography was performed by Foresight West Surveying, Inc. (Foresight West). The <br />design features, consistent with those submitted previously as part of the existing VLF design, <br />have been selected and developed through the integration ofstate-of--the-art methods, design <br />criteria, and site-specific conditions to minimize the potential for releases to the environment. <br />1.3 Design Criteria <br />• <br />Smith Williams completed the engineering design for Phase 5 VLF using the following design <br />criteria: <br />1.3.1 Valley Leach Facility (VLF) <br />Parameter Value <br />Maximum ore depth over liner 800 feet (Phase I through Phase IV) <br />590 feet Phase 5 <br />Nominal ore angle of repose slope 1.3H:1V <br />Overall operational ore side slope against_u slo in round 1.6H:1V <br />Overall operational ore side slope against downslo in round 2.5H:1 V <br />Overall operational ore side slope above Phase 5 VLF PSSA embankment 2.OH:1 V <br />Maximum lift height 100 feet <br />S:\PROJECTS\1125 CC&V PHASE 5 VLF\H2 - DESIGMAREQUA VLFlVLF PHASE 5 FINAL REPORT V2.DOC <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.