Laserfiche WebLink
~~~ <br />SMITH WILLIAMS CONSULTANTS, INC. <br />• <br />^ Appendix C.2 - Geomembrane Calculations <br />^ Appendix C.3.1 - Phases I Through 5 Primary Solution Collection Pipe Burial <br />Calculations <br />^ Appendix C.3.2 -Phase 5 VLF Primary Solution Collection Pipe Burial Calculations <br />^ Appendix C.4 -Primary Solution Collection Pipe Flow Calculations <br />^ Appendix C.5 -Riser Pipe Calculations <br />^ Appendix C.6.1 -VLF Foundation Settlement Calculations <br />^ Appendix C.6.2 - AGOSA Foundation Settlement Calculations <br />^ Appendix C.7.1 -Phase IVa Ore Slope Settlement Calculations <br />^ Appendix C.7.2 -Phase 5 VLF PSSA Embankment Settlement Calculations <br />• Appendix C.8 -High Volume Solution Collection System Piping <br />^ Appendix C.9 - Underdrain Calculations <br />^ Appendix D -Assessment of Underground Workings within Limits of Phase 5 Valley <br />Leach Facility <br />^ Appendix E -Phase 5 VLF Slope Stability Results <br />^ Appendix E.1 -Infinite Slope Analysis <br />^ Appendix E.2 -Slope Stability Files <br />^ Appendix F -Surface-Water Hydrology <br />^ Appendix F.1 -Letter to DRMS Pertaining to SCS Runoff Curve Numbers <br />^ Appendix F.2 -Surface Water Hydrology Design <br />^ Appendix G -Water Balance Results <br />^ Appendix G.1 -Water Balance Model <br />S:\PROJECTS\1125 CCBV PHASE 5 VLF\H2 - DESIGNVIREQUA VLFIVLF PHASE 5 FINAL REPORT V2.DOC <br />5 <br />