My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (256)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (256)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:05 PM
Creation date
5/8/2008 1:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Valley Leach Facility Phase 5 Extension Design
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~`. - <br />SMITH WILLIAMS CONSULTANTS, INC. <br />• <br />^ Appendix B.1 -Phase 5 VLF Material Property Testing <br />^ Appendix B.2 -Golder 2005 Liner Load Testing For TR 45 <br />^ Appendix B.3 -Drain Cover Fill Permeability Testing <br />^ Appendix B.4 -Cresson Ore Percolation and Consolidation Tests <br />^ Appendix B.5 -Ore Shear Strength Test Data <br />^ Appendix B.5.1 -Cresson Ore Shear Strength Test Results (1996) <br />Appendix B.6 -Interface Shear Strength Testing <br />^ Appendix B.6-1 -Phase 5 Interface Shear Strength Testing <br />^ Appendix B.6-2 -Phase IV Interface Shear Strength Testing (Originally Submitted as <br />Part of Amendment No. 8) <br />^ Appendix B.6-3 -Interface Shear Strength Testing for Phase I (Ironclad Borrow Area <br />• 1993) (Originally Submitted as Part of Amendment Nos. 6 and 7) <br />^ - .Appendix B.6-4 -Interface Shear Strength Testing for Phase II (Borrow Area No. 5 <br />1996a) (Originally Submitted as Part of Amendment Nos. 6 and 7) <br />^ Appendix B.6-5 -Interface Shear Strength Testing for Phase III (Borrow Area No. 2 <br />1996b) (Originally Submitted as Part of Amendment Nos. 6 and 7) <br />^ Appendix B.6-6 -Interface Shear Strength Testing for Borrow Area No. 2 (1996c) <br />(Originally Submitted as Part of Amendment Nos. 6 and 7) <br />^ Appendix B.7 -Cresson Ore Data <br />^ Appendix B.7.1 -Cresson Ore Draindown Data <br />^ Appendix B.7.2 -Cresson Ore Moisture Data <br />Appendix C -Design Calculations <br />^ Appendix C.1 - Geogrid Calculations <br />• <br />S:\PROJECTS\1125 CCBV PHASE 5 VLF\H2 - DESIGMAREQUA VLF\VLF PHASE 5 FINAL REPORT V2.DOC 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.