My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-24_REVISION - M1997054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997054
>
2008-04-24_REVISION - M1997054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:12 PM
Creation date
5/5/2008 2:48:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
REVISION
Doc Date
4/24/2008
Doc Name
Proposed Bond Phasing
From
Applegate Group, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sand and Gravel -PHASE III, YEAR 12 <br />Aspect Reclamation Operation Quantity Unit Unit Cost ($) Cost ($) <br /> Reclaim exposed mining face <br /> 1 Clay Liner (15 ft x 30 ft x 8640 ft & 5 ft x 16 ac) 168,894 CY 1.30 219,563 <br />A 2 Shell material (granite fines) 112,944 CY 1.0 112,944 <br /> 3 Place topsoil on slopes and bottom (6 in) 26,039 CY 0.85 22,134 <br /> 4 Seed and mulch slope 32 Ac 675 21,789 <br /> 5 Reseed (20%) 6.5 Ac 675 4,358 <br /> Topsoil and overburden stockpiles <br />B 1 Material removed for other Aspects n/a 0 <br /> 2 Seed and mulch 1 Ac 675 675 <br /> 3 Reseed (20%) 0.2 Ac 675 135 <br /> Access road and office <br /> 1 Access road around perimeter are to remain 2 Ac n/a 0 <br /> 2 Scarify compacted ground on remaining access roads 3 Ac 25 75 <br />C 3 Replace topsoil (6 in) 2,259 CY 0.85 1,920 <br /> 4 Seed and mulch 3 Ac 675 2,025 <br /> 5 Reseed(20%) 0.6 Ac 675 405 <br /> 6 Entrance road to site to remain 1 Ac n/a 0 <br /> Product stockpiles <br /> 1 Scarify compacted ground 3.6 Ac 25 90 <br />D 2 Replace topsoil (6 in) 24,500 CY 0.85 20,825 <br /> 3 Seed and mulch 3.6 Ac 675 2,430 <br /> 4 Reseed (20%) 0.7 Ac 675 486 <br /> Stormwater Reclamation <br /> 1 eackfill stormwater ponds 127.5 CY 1.00 128 <br /> 2 Replace topsoil (6 in) 201.7 CY 0.85 171 <br />E 3 Seed and Mulch 0.25 Ac 675 169 <br /> 4 Reseed (20%) 0.1 Ac 675 34 <br /> Inlet and Outlet Facilities for Reservoir <br />F 1 Portable pump and ancillary equipment 1 Unit Note 1 0 <br /> Berms <br /> 1 Berm Removal 32,593 CY 0.85 27,704 <br />G 2 Seed and Mulch 2 Ac 675 1,364 <br /> 3 Reseed (20%) 0.4 Ac 675 273 <br />Total Disturbance Costs 439,696 <br />Contractor Mobilization/Demobilization (8%) 35,176 <br />Overhead (18.5%) 81,344 <br />Administration (5%) 21,985 <br />Total Pro osed Financial Warrant $ 578 200 <br />Disturbed Acreage 45 <br />Financial Warranty per acre $ 12,921 <br />Note 1: Temporary structures, pumps, and ancillary equipment is assumed to be removed by the operator or sold to finance removal <br />
The URL can be used to link to this page
Your browser does not support the video tag.