Sand and Gravel -PHASE il, YEAR 8 <br />Aspect Reclamation Operation Quantity Unit Unit Cost ($) Cost ($) <br /> Reclaim highwalls with ?0' Liner (some relcamotion in process) <br /> 1 Backfill mining face of 40 ft highwalls (4000 If) 118,519 CY 1.15 136,297 <br /> 2 Clay blanket (15 ft wide x 3740 If) 69,606 CY 1.30 90,488 <br />A 3 Shell material (granite fines @ 42401f) 223,778 CY 1.00 223,778 <br /> 4 Place topsoil on slopes and bottom (6 in) 14,701 CY 0.85 12,496 <br /> 5 Seed and mulch slope 18 Ac 675 12,150 <br /> 6 Reseed (20%) 3.6 Ac 675 2,430 <br /> Reclaim central area (36 acJ <br />8 1 Place topsoil 29,040 CY 0.85 24,684 <br /> 2 Seed and mulch 36 Ac 675 24,300 <br /> 3 Reseed (20%) 7.2 Ac 675 4,860 <br /> Topsoil and overburden stockpiles <br /> 1 Material removed for other Aspects (completed) n/a 0 <br />C 2 Seed and mulch 4.0 Ac 675 2,700 <br /> 3 Reseed (20%) 0.8 Ac 675 540 <br /> Product stockpiles <br /> 1 Scarify compacted ground 3.6 Ac 25 90 <br />D 2 Repiacetopsoil (6 in) 24,500 CY 0.85 20,825 <br /> 3 Seed and mulch 3.6 Ac 675 2,430 <br /> 4 Reseed (20%) 0.7 Ac 675 486 <br /> Sedimentation ponds <br /> 1 Pump and ancillary equipment removal 1 Unit Note 1 0 <br /> 2 Backfill ponds (overburden) 8,889 CY 0.85 7,556 <br />E 3 Replace topsoil (6 in) 889 CY 0.85 756 <br /> 4 Seed and Mulch 1 Ac 675 675 <br /> 5 Reseed (20%) 0.2 Ac 675 135 <br /> Access road and office <br /> 1 Access road around perimeter are to remain 2 Ac n/a 0 <br /> 2 Scarify compacted ground on remaining access roads 3 Ac 25 75 <br />F 3 Replace topsoil (6 in) 2,259 CY 0.85 1,920 <br /> 4 Seed and mulch 3 Ac 675 2,025 <br /> 5 Reseed(20%) 0.6 Ac 675 405 <br /> 6 Entrance road to site to remain 1 Ac n/a 0 <br /> Conveyer Belt System and Processing Plant Removal <br /> 1 Conveyer belt and ancillary equipment removal 1 Unit Note 1 0 <br /> 2 Concrete support structures 20 CY 12.69 254 <br /> 3 Processing plant and ancillary equipment removal 1 Unit Note 1 0 <br />G 4 Scarify compacted ground 26 Ac 25 650 <br /> 5 Replace topsoil (6 in) 20,973 CY 0.85 17,827 <br /> 6 Seed and Mulch 26 Ac 675 17,550 <br /> 7 Reseed (20%) 5.2 Ac 675 3,510 <br /> Dewatering Trench <br />H 1 Pump and ancillary equipment removal 1 Unit Note 1 0 <br /> 2 Backfill trench with clay (key trench) 6,453 CY 1.30 8,389 <br /> Stormwater Reclamation <br /> 1 Backfill Stormwater ponds 127.5 CY 1.00 128 <br /> 2 Replace topsoil (6 in) 201.7 CY 0.85 171 <br />I 3 Seed and Mulch 0.25 Ac 675 169 <br /> 4 Reseed (20%) 0.1 Ac 675 34 <br /> Inlet and Outlet Facilities for Reservoir <br />J 1 Portable pump and ancillary equipment 1 Unit Note 1 0 <br /> Berms <br /> 1 Berm Removal 32,593 CY 0.85 27,704 <br />K 2 Seed and Mulch 2 Ac 675 1,364 <br /> 3 Reseed (20%) 0.4 Ac 675 273 <br />Total Disturbance Costs 650,122 <br />Contractor Mobilization/Demobilization (8%) 52,010 <br />Overhead (18.5%) 120,273 <br />Administration (5%) 32,506 <br />Total Pro osed Financial Warran $ 854,910 <br />Disturbed Acreage 96 <br />Financial Warranty per acre $ 8,862 <br />Note 1: Temporary structures, pumps, and ancillary equipment is assumed to be removed by the operator or sold to finance removal <br />