Laserfiche WebLink
_._ <br />_. <br />_._ __ <br />_.. <br />_ _ <br />_ _ <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $45.74 1 $45.74 $45.74 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $45.74 $45.74 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Eagle <br />Transportation Cvcle Time : Non- Total one-way travel distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.38 0.38 Total non-roadable mob/demob cost'` : $365.35 <br />Return time (hours) = 0.38 0.38 `two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "" : $34.30 <br />Unloading time (hours) = 0.50 NA •~ one round trip, no haul rig <br />Subtotals = 1.75 0.75 <br />JOB TIME AND COST Total job time : 3.50 hours <br /> Total job cost : $400 <br />