Laserfiche WebLink
~ROJECT IDENTIFICATION <br />----- <br />ate_._ _____ ' 30-Apr-08 _-__ - - <br />-- <br />User: --- JRS - ---- - --------- ---- ----- <br />Permit <br />C_-1981-038 iSite: Bowie No. 1 Mine <br />_ _ _ _iState--Colorado ~- <br />C038-230County: Delta I <br />----- - ------------ <br />----_ --_._ ----- _ __ _ _ ____ _ _ __ iFilename: <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action-Technical Revision 49 ----- - - <br />Task Task Description ~ -- <br />-- - - _ --- <br />231 i Plug and Seal Two Exploration Boreholes <br />---------- <br />232 Regrade Drill Pads ----- -- -- - --- --- ---- <br />_._- <br />---------------- -- -- - --------------------- <br />_33 - ;Regrade Light-Use Road <br />234 ---- - -- - <br />__;Replace Topsoil from Stockpile to Drill Pads <br />---- _.. <br />-------------------------- -- <br />_ 5 ;Replace Topsoil from- Stockpile Light-Use Road <br />236 -- -- Reseed Drill Pads -------------- ---- <br />237 iReseed Li ht-Use Road -- ----- - <br />- -- <br />g - -- _ __ _ <br />--- -- - -- <br />__ echnical Revision 44 CREDIT (See Attached Summary Sheet)--_ _ - <br />__ _ _ - ~ Direct Cost Total -- ----------- <br />- INDIRECT COSTS -- -- <br />_ _ Overhead and Profit <br />Liabili Insuranc - - - <br />____ _.. _ _ _.- _ty________- e (1.55% of Direct Costs) <br />;Performance Bond (1.05% of Direct Costs) <br />_ _ _ :lob Superintendent (at $41.25/hour) <br />'Profit (10.00% of Direct Costs) - - <br />otal Overhead and Profit - <br />------ <br />- -- <br />- --- - --- <br />Contract Amount (Direct Costs + Overhead and Profit) <br />-- __ __ <br />Leal - Eneineerin~ Pro3ect M_ana em_ent <br />_ _ Engineering Work and ContractlBid Preparation (4 25% of Contract) _ _! <br />Reclamation Mana ement and Administration (3 25% of Contract) ~ <br />- - ----- ---- g --- <br />--- - <br />---- <br />- - - --- -r_ ---- ------ -- -- -- ------ --- ---- <br />_ ;TOTAL BOND AMOUNT --- ------- --I <br />Bowie No. 1 Mine C-1981-038 <br />Technical Revision 49 <br />TASK HOURS ~ DIRECT COST <br />_3_2.00 $13,633 <br />----- <br />3.63 _ <br />_ $753 <br />__1_4.40 __-- $2,9 <br />89 <br />1.93 _ <br />$401 <br />7.48 ---- $1,552 <br />0.92 $630 <br />_ <br />2._62 <br />64.13 _ ----_ $1,793 <br />~ ------ -$20,076 <br />-1.15 ~ $1 <br />I $26 <br />----- ---~ ------ --- $18 <br />-0.57 ~ -------- --- - -$24 <br />-- I -- ---------$168 <br />1 __ 187 <br />- - - - 1-- -- -- - ------- <br />-~ <br />--- - --- i <br />-- <br />~ -,-- --- <br />_____ <br />- -- -- <br />_ __-- $1 862 <br />-- - - - - -- --1 <br />- - <br />--- ----- <br />-- - _ _- <br />-- - <br />- - -- <br />- --- -- <br />-- <br />-- -- (-- - <br />__ <br />-- - -- --- <br />_ -- - - $79 <br />- __~ --- <br />-- --- - - <br />-- -- _ <br />61 <br />--------------- <br />J - --------- <br />jrs Page 1 <br />4/30/2008 <br />