My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-30_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-04-30_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:56 PM
Creation date
5/1/2008 12:48:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
4/30/2008
Doc Name
Cost Estimate Memo
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
TR49
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />-&- <br />SAFETY <br />INTEROFFICE Bill Ritter, Jr. <br /> <br />MEMORANDUM Governor <br /> Harris D. Sherman <br /> Executive Director <br />TO: Marcia Talvitie Ronald W. Cattany <br /> Division Director <br /> Natural Resource Trustee <br />FROM: Jim Stark <br />SUBJECT: Bowie No. 1 Mine TR-49 Estimate <br />DATE: 30 Apri12008 <br />Attached is the reclamation cost estimate for the Bowie No. 1 Mine's Technical Revision <br />49 -two exploration holes. The revision is 8 tasks (a summary sheet and tasks 231-237) <br />and represents an increase in liability of $2,002.00. When you fill out the coding form <br />to propose a decision to approve the revision, you will put that amount (the $2,002.00) in <br />the space labeled "Change in Required Liability Amount". <br />This estimate includes a credit for the work permitted and never completed under <br />Technical Revision 44. I have attached the summary sheet.for TR-44 to the back of the <br />TR-49 estimate as a reference. <br />The estimate is basically broken into five separate parts. The first part is the plugging <br />and sealing of the boreholes on task 231. The second part is the regrading work on the <br />drill pads and the roads on tasks 232 and 233. The third part is the topsoil replacement <br />on the drill pads and roads on tasks 234 and 235. The fourth part is the reseeding of the <br />drill pads and roads on tasks 236 and 237. The fifth and final part is the summary sheet <br />on task 230. This summary sheet includes all of the pertinent indirect costs. As stated <br />above, with this estimate I have also included a summary sheet for Technical Revision <br />44, which details the credit for the work permitted but never completed. <br />Please let me know if you have any questions or need any additional information. <br />cc: Sandy Brown w/out attachments <br />Office of <br />Office of <br />Minari lanr• Rarlamatinn ncnvn. r.~.,a ~.....-H.,.. n.,.~...... ._...._ __~ ___...._ ~..___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.