Laserfiche WebLink
RE: Carbon Junction Mine Phase I Bond Release Calculation Errors <br />Kaldenbach, Tom <br />From: <br />Sent: <br />To: <br />Subject: <br />Kaldenbach, Tom <br />Wednesday, April 16, 2008 6:59 PM <br />'savageandsavage@earthtink. net' <br />C iy~rZ D ~v <br />Page 1 of 2 <br />.SL '~ <br />Q ~ b vvc ~c ti <br />FW: Carbon Junction Mine Phase I Bond Release Calculation Errors <br />Attachments: s13004.PDF <br />Mike, <br />I have been waiting for a request from you to change the bond release amount to $314,909 (based on my <br />4/7/2008 email, shown below), then I can turn in the coding form to have the bond release approved. <br />Tom <br />From: Kaldenbach, Tom <br />Sent: Mon 4/7/2008 5:15 PM <br />To: 'savageandsavage@earthlink.net' <br />Subject: RE: Carbon Junction Mine Phase I Bond Release Calculation Errors <br />Mike, <br />I should not have used the word "liability" on the column in the spreadsheet which calculated the Phase I 60% limit. <br />Completed tasks have no further liability. <br />To simplify the calculation, I have changed the spreadsheet to apply the Phase [ 60% limit to each area of the site. Based on <br />this calculation, the amount that can be released in SL-03 is $314,909. [believe any resulting excess bond above the liability <br />amount that remains on deposit can be eliminated through a bond adjustment(3.02.2(4)when Iupdate the cost estimate for the <br />permit renewal in the next few weeks, but I will need to verify this ([ am sorry, but I will not be able update the estimate <br />sooner). <br />Please note on the following tasks. <br />No work on topsoil stockpile 4 has been completed (Tasks 038, 039, and 041), as documented in the bond release inspection <br />report from 11/7/06. These tasks are required by the reclamation plan (page 5-29) and the postmining topography map <br />(approved in TR-13). The letter dated 1/5/06 from DBMS in the TR-13 file explained the need to revise the gravel pit's <br />reclamation plan to accommodate material from stockpile 4, but the gravel pit is now reclaimed; therefore, the coal mine <br />reclamation plan for stockpile 4 needs to be revised in a Technical Revision. <br />Tasks 050 and O51 are required by Rule 3.02.1(7) which requires retention of bond for tasks that would be required should an <br />approved alternative land use such as commercial, industrial, or residential not be implemented, and consequently the site <br />would become subject to a 10-year liability period. <br />I am nearly finished with the findings document. All gully repair work has been inspected and looks good. When we <br />conclude on the dollar amount that can be released, you will need to request that the release amount in your application be <br />changed to that amount (an email request works), and then I can have SL-03 approved. <br />Tom <br />-----Original Message----- <br />From: savageandsavage@earthlink.net [mailto:savageandsavage(a,earthlink.net] <br />Sent: Monday, April 07, 2008 9:44 AM <br />To: Sandra Pautsky; Kaldenbach, Tom <br />4/17/2008 <br />