My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-04_REVISION - C1994082 (4)
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2008-04-04_REVISION - C1994082 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:03 PM
Creation date
4/7/2008 11:24:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
4/4/2008
Doc Name
Cost Estimate
From
Jim Stark
To
Dan Mathews
Type & Sequence
MT3
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />................ <br />TASK .......................................................................................................................................................... <br />LIST (DIRECT COSTS) ...................... <br />FORM ................. <br />FLEET ..................... <br />TASK .............................. <br />DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />01 b -Drill and Shoot Valora Pit FJW (Scraper Pit) Highwall blasting 1 92.4 $25, 201 <br />01 c -Drill and Shoot Wolf Creek Pit North Highwall blasting 1 58.9 $16, 066 <br />01d -Drill and Shoot Wolf Creek Pit South Highwall blasting 1 115.8 $31,568 <br />01e -Drill and Shoot Current Pit Highwall blasting 1 40.6 $11,083 <br />01 f -Drill and Shoot Neck Pit Highwall blasting 1 36.5 $9, 976 <br /> <br />02a -Grade Valora Pit N/S Highwall dozer 2 117.11 $101,404 <br />02b -Grade Valora Pit E/VV (Scraper Pit) Highwall dozer 2 65.3 $56, 604 <br />02c -Grade Wolf Creek Pit North Highwall dozer 2 41.71 $36,119 <br />02d -Grade Wolf Creek Pit South Highwall dozer 2 81.7 $70, 766 <br />02e -Grade Current Pit Highwall dozer 2 28.9 $25, 054 <br />02f -Grade Neck Pit Highwall dozer 2 26.2 $22, 715 <br /> <br />03a -Grade Adjacent Valora Pit N/S Spoil Ridges dozer 2 42.3 $36, 682 <br />03b -Grade Adjacent Valora Pit E/W (Scraper Pit) Spoil Ridges dozer 2 33.3 $28,865 <br />03c -Grade Adjacent Wolf Creek Pit North Spoil Ridges dozer 2 21.2 $18,428 <br />03d -Grade Adjacent Wolf Creek Pit South Spoil Ridges dozer 2 41.6 $36,098 <br />03e -Grade Adjacent Current Pit Spoil Ridges dozer 2 14.7 $12, 776 <br />03f -Grade Adjacent Neck Pit Spoil Ridges dozer 2 13.3 $11,585 <br /> <br />04a -Grade Remaining Valora Pit N/S Spoil Ridges dozer 2 44.0 $38,155 <br />04b -Grade Remaining Valora Pit E/W (Scraper Pit) Spoil Ridges dozer 2 34.6 $30, 013 <br />04c -Grade Remaining Wolf Creek Pit North Spoil Ridges dozer 2 22.11 $19,142 <br />04d -Grade Remaining Wolf Creek Pit South Spoil Ridges dozer 2 43.3 $37,527 <br />04e -Grade Remaining Current Pit Spoil Ridges dozer 2 15.3 $13,296 <br /> <br /> <br />005 -Regrade Drill Pads Associated with Minor Revision 17 dozer 2 1.0 $942 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 1,032.9 $690,065 <br />
The URL can be used to link to this page
Your browser does not support the video tag.