Laserfiche WebLink
EXHIBIT L <br />RECLAMATION COSTS <br />1. Revegetation, 5.49 ac @ $500.00/ac <br />2. Resoiling, 2,952 yd3 x $0.425/yd3 <br />3. Sloping using cut/fill method <br />2,499 yd * 1.23 x $0.16yd3 <br />4. Seed bed grading and backfill slope shaping <br />24.21 ac x $80.54/ ac. <br />5. Secondary Seeding 5.49 ac @30% x $500.00/ac <br />Net Total <br />6. Indirect costs <br />Mobilization <br />Insurance, Bond, & Profit <br />7. Administration costs <br />TOTAL ESTIMATE <br />RECLAMATION COSTS (cont) <br />$ 2,745.00 <br />1,253.60 <br />400.02 <br />1,949.80 <br />823.50 <br />$7,171.92 <br />3,169.67 <br />898.28 <br />717.19 <br />$11,957.06 <br />GRAND COUNTY DEPARTMENT OF ROAD AND BRIDGE IS A LOCAL GOVERNMENT AGENCY <br />AND AS SUCH IS NOT REQUIRED TO POST A BOND. <br />16 <br />