Laserfiche WebLink
IV. Problems., Recommendations and Compliance Dates <br /> The operator is advised that the following problems have been identified <br /> during inspections and that failure to correct the problems may result in <br /> the Division taking an ENFORCEMENT ACTION pursuant to CRS 1973, as <br /> amended, 34-33-123. (Recommendations and compliance dates are to be <br /> clearly noted. Dates are to be. specific, e.g. , January 31 , <br /> underlined.) 1983 and <br /> 017-83-12 Repair the berm on the outside edge of the Mine 4 road by <br /> October 17 1983. <br /> 017-83-13 Clean the slurry from the undisturbed area outside the slurry <br /> pond west of the wash plant and rebuild the embankment so a minimum of <br /> one-foot of freeboard above the level of the emergency spillway is <br /> maintained. This work must be completed by November 15, 1983. <br /> 017-83-14. Sediment pond 006 must be cleaned by October 17, 1983. <br /> 017-83-15 The erosion on the road above sediment pond 006 must be <br /> repaired by October 24 1983. <br /> 017-83-16 The drainage ditch below the north side of the Mine 1 stockpile <br /> must be cleaned by October 17, 1983. <br /> 017-83-17 Restore the berm around the Rock Tunnel (powder magazine by <br /> October 17, 1983. <br /> 017-83-18 Build a berm along the south side of the ramp/road to the artic <br /> circle pump to direct drainage into the artic circle ponds by October 17, <br /> 1983. <br /> 017-83-19 Redefine the Mine 5 disturbed drainage ditch on the south side <br /> of the lower pad by October 17. 1983. <br /> 017-83-20 Extend the berm to the warehouse pond along the edge of the <br /> storage area south of the warehouse by October 24 1983. <br /> 017-83-21 Regrade the topsoil stockpile above the Mine 1 coal stockpile <br /> and erect a topsoil marker by October 24, 1983. <br /> The following problem is still in the process of resolution. <br /> 017-83-8 Remove the' coal that is beyond the berm on the southwest corner <br /> of the Mine No. 2 coal stockpile as soon as the s-tockpile is sufficiently <br /> small enough to facilitiate removal of the fugitive coal . <br />