_INSPECTION - C1981017 (22)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981017
>
_INSPECTION - C1981017 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 11:41:48 AM
Creation date
8/7/2008 4:38:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
From
DRMS
To
Mid-Continent Resources, Inc.
Inspection Date
11/2/1983
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. Problems, Recommendations and Compliance Dates <br /> The operator is advised that the following problems have been identified <br /> during inspections and that failure to correct the problems may result in <br /> the Division taking an ENFORCEMENT ACTION pursuant to CRS 1973, as <br /> amended, 34-33-123. (Recommendations and compliance dates are to be <br /> clearly noted. Dates are to be specific, e.g. , January 31 , 1983 and <br /> underlined. ) <br /> Resolution in Progress <br /> 017-83-8. Remove the coal that is beyond the berm on the southwest <br /> corner of the Mine No. 2 coal stockpile as soon as the stockpile is <br /> sufficiently small enough to facilitate removal of the fugitive coal. <br /> 017-83-13. Clean the slurry form the undisturbed area outside the slurry <br /> pond west of the wash plant and rebuild the embankment so a minimum of <br /> one-foot of freeboard above the level of the emergency spillway is <br /> maintained. This work must be completed by November 15, 1983. <br /> 017-83-14. Sediment pond 006 must be cleaned by November 7, 1983 <br /> (compliance deadline extended because of equipment problems) . <br /> 017-83-16. The drainage ditch below the north side of the Mine No. 1 <br /> stockpile must be cleaned by November 7, 1983 (compliance deadline <br /> extended because of equipment problems) . <br /> 017-83-21 . Regrade the newly established topsoil stockpile above the <br /> Mine No. 1 coal stockpile and erect a topsoil marker by November 7, 1983 <br /> (compliance deadline extended because of equipment problems) . <br /> 017-83-22. Clean the material tracked onto the access road from the <br /> preparations plant near the front gate by November 21 , 1983. <br /> 017-83-03. Build up a berm along the outside edge of the Mine No. 4 road <br /> from the powder magazine down by November 21 , 1983. <br /> 017-83-24. Divert the overflow from the arctic circle pump pond into <br /> Dutch Creek by November 21 , 1983. <br /> 017-83-25. Build a berm along the edge of the pad east of the MSHA <br /> trailer at Mine No. 1 by November 21 , 1983. <br /> 017-83-26. Clean the upper two sediment ponds below the refuse pile by <br /> November 21, 1983. <br /> 017-83-27. Install the new pipe between ponds 2 and 3 over Bear Creek <br /> below the refuse pile by November 7, 1983. <br />