Laserfiche WebLink
Subtotals : $0.00 I $0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br />i <br />Meeker <br /> on ; <br />Nearest major city or town within project area reg <br />Transportation Cycle Time : Non- Total one-way travel distance : 12.0 miles <br />h <br />0 m <br />30 <br /> Roadable Roadable Average travel speed : p <br />. <br /> Equipment Equipment <br />40 <br />0 <br />Total non-roadable mob/demob cost <br />$1,973.56 <br />Haul time (hours) = 0.40 . <br /> <br />Return time (hours) = <br />0.40 <br />0.40 two round trips with haul rig <br />* <br />- <br />Loading time (hours) 0.50 NA Total roadable mob/demob cost'` : $0.00 <br />Unloading time (hours) = 0.50 NA <br />* one round trip, no haul rig <br />Subtotals = 1.80 0.80 <br /> Total job time : 3.60 hours <br />JOB TIME AND COST <br />Total job cost $1,974