Laserfiche WebLink
<br /> <br />CIRCES Cost Estimating Software <br /> <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS ------ - <br />Task # : 05a State :Colorado Permit/job # : M-2000-073 <br />Date County: Rio Blanco Abbreviation :none -- - <br />User : SSS Site : Schultz Gravel Pit Filename :M073-05a <br />,feG41MlCAl RIL/If Oo 1 <br />Permit or other job action : - <br />Task description : Transport reclamation equipment to/from site' <br />EQUIPMENT TRANSPORT RIG COST Shift basis: 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NUN-KUALIMS r MAUIrrvIV-1-41 <br />Machine Weight/unit <br />Description (Tons) <br />-Cat D7R DS Series 11- 7SU 35.17 <br />-Cat 633E Series 2 (2001) 56.34 <br />-Revegetation equip. _ 15.00 <br />Ownership <br />Cost/hr/unit <br />$42:70 <br />$81.70 <br />$20.00 <br />Haul Rig <br />Cost/hr/unit <br />$117.55 <br />8125.45 <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />1 <br />2 <br />Haul Trip <br />Cost/hr/fleet <br />$160.25 <br />$207.15 <br />$217.34 <br />Return Trip <br />Cost/hr/fleet <br />$117.55 <br />$125.45 <br />$177.34 <br />DOT permit <br />Cost/fleet <br />$0.00 <br />__$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $584.75 $420.34 $0.00 <br />