My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-31_HYDROLOGY - M1997058
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1997058
>
2008-07-31_HYDROLOGY - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:05 PM
Creation date
8/1/2008 9:44:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
HYDROLOGY
Doc Date
7/31/2008
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
Civil Resources, LLC
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Andy Rodriguez, P.E. <br />July 31, 2008 <br />Page 4 <br />4. The Water Commissioner responsible for the administration of this plan is Mr. Scott <br />Edgar, 1735 Dolores River'Drive, Windsor, CO 80550. The applicant shall maintain <br />daily records of all diversions;-replacements, and the amount of water used for each <br />particular purpose. The applicant shall provide a report of these records to the division <br />engineer and the water commissioners on a monthly basis on a form approved by them. <br />The accounting must be submitted, within thirty (30) calendar days of the end of the <br />month for which the accounting is being made. <br />In addition, the applicant shall submit a report from the City of Aurora ("Aurora"). The <br />report shall include an accounting of all replacement water controlled by Aurora, <br />showing the total volume of water under its control and the amount committed to each of <br />the recipients of the water. <br />5. Since the water leased from the City of Aurora will be used to replace depletions under <br />this SWSP and the C.R.S. 37-92-308(4) SWSP approved for Bestway Concrete, the <br />applicant's accounting for each SWSP must show the total amount of effluent released <br />and the amount associated with each SWSP. <br />6. All diversions shall be measured in a manner acceptable to the division engineer. The <br />Applicant shall install and maintain such measuring devices as required by the division <br />engineer for operation of this SWSP. <br />7. All releases of replacement water must be sufficient to cover all out of priority depletions <br />and be made under the direction and/or approval of the water commissioner. The <br />replacement may be aggregated. to maximize beneficial use. The water commissioner <br />and/or division engineer shall determine the rate and timing of an aggregated release. <br />8. The name, mailing address, and phone number of the contact person who will be <br />responsible for operation and accounting of this plan must be provided on the <br />accounting forms to the division engineer and water commissioner. <br />9. The approval of this substitute water supply plan does not relieve the Applicant and/or <br />landowner of the requirement to obtain a Water Court decree approving a permanent <br />plan for augmentation or mitigation to ensure the permanent replacement of all <br />depletions, including long-term evaporation losses and lagged depletions after gravel <br />mining operations have ceased. If reclamation of the mine site will produce a <br />permanent water surface exposing groundwater to evaporation, an application for a plan <br />for augmentation must be filed with the Division 1 Water Court at least three (3) years <br />prior to the completion of mining to include, but not be limited to, long-term evaporation <br />losses and lagged depletions. If a lined pond results after reclamation, replacement of <br />lagged depletions shall continue until there is no longer an effect on stream flow. <br />10. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other, water rights has or will occur as a result of this plan. <br />11. Should this substitute water; supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below <br />the water table, and all other use of water at the pit, must cease immediately.