Laserfiche WebLink
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G <br />E <br />C <br /> <br />Acquisition cost : <br />$13.36 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA . <br />. <br />. <br />NA <br />Econ.life -Dozer and ROPS : <br />-Attachment no. 2 : <br />Annual usage : $13.36 <br />NA <br />$21.96 NA <br />NA <br />$10.45 NA <br />NA <br />$14.27 $4.33 <br />$0.48 <br />NA $8.80 <br />$0.93 <br />NA $5.33 <br />$0.80 <br />NA $8.53 <br />$1.16 <br />NA NA <br />NA <br />NA NA <br />NA <br />NA NA <br />NA <br />NA NA <br />NA <br />NA <br />Double shifts : $16.47 $5.23 $7.13 NA NA NA NA NA NA NA NA <br />Triple shifts : <br />Mechanic labor-Dozer and ROPS : $14.65 <br />NA $3.48 <br />NA $4.75 <br />NA NA <br />$3.38 NA <br />NA NA <br />$4.16 NA <br />NA NA <br />NA NA <br />NA NA <br />NA NA <br />NA <br />-Attachment no. 2 : NA NA NA $0.37 NA $0.62 NA NA NA NA NA <br />Fu <br />l/l <br />b <br />D <br />e <br />u <br />e - <br />ozer and ROPS : NA NA NA NA NA NA NA $25.18 $4.73 $0.00 $1.42 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.24 $0.00 $0.97 <br /> <br />ADJUSTED COST SUBTOTALS <br /> <br /> <br /> <br />ozer, ROPS and Attachment no. 2 : T <br /> <br /> <br /> <br />epreciation <br /> <br />Ownership Costs <br /> <br />CFC <br /> <br /> <br /> <br />verhead <br /> <br /> <br />verhaul <br />Labor Parts <br />Dozer and ROPS <br />- ' <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires <br />- <br /> <br /> <br />G.E.C. <br />Single shifts : $21.96 $10.45 $14.27 $3.38 $8.80 $4.16 $8.53 $25.18 $4.73 $0.00 $1.42 <br />Double shifts : $16.47 $5.23 $7.13 Ripper : <br />Triple shifts : $14.65 $3.48 $4.75 $0.37 $0.93 $0.62 $1.16 $0.00 $0.24 $0.00 $0.97 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> <br />Dozer operator (< 70hp) Rate <br />$20 <br />67 Benefits <br />$7 <br />22 7.65% <br />1 <br />5 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br /> <br />Dozer operator (>=70hp) . <br />$20 <br />67 . <br />$7 <br />22 $ <br />. <br />8 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br /> <br />Mechani . <br />$20 <br />97 . <br />$7 <br />22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br /> . . $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HOURLY EQUIPMENT COST <br />SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $46.68 $56.19 $4.30 $32.78 $139.95 <br />Double shifts : $28.83 $56.19 $4.30 $32.93 $122 25 <br />Triple shifts : $22.88 $56.19 $4.30 $33.03 $116.40 <br />EQUIPMENT SPECIFICATIONS <br />D7R DS Series 11 - 7SU <br />RIPPER: <br />Transmission Weight Length Width Height Fuel Horsepower <br />Type (UST) (ft.) (ft.) (ft.) type (fhp) <br />27.3 19.8 8.3 11.6 diesel 240 <br />3-shank ripper Parallelogram <br />Total machine shipping weight : <br /> <br />Weight <br />Capacity <br />Width Height Travel speeds (mph) : <br />Gear: 1st <br />2nd 3rd <br />(UST) (cy) (ft.) (ft.) Forward : 2 <br />3 4 <br />3 <br /> . . 6.9 <br />4.0 8.98 12.1 5.0 Reverse : 3.0 5.2 8 <br />8 <br />Weight <br />(UST) <br />3.9 No. of <br />shanks <br />3 Shank <br />spacing (ft) <br />3.2 Beam <br />width (ft) <br />6.5 . <br />Max. rip <br />depth (ft) <br />2.5 <br />35.2 US tons