My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-08_PERMIT FILE - M2007087
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007087
>
2008-07-08_PERMIT FILE - M2007087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:23 PM
Creation date
7/25/2008 8:36:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007087
IBM Index Class Name
PERMIT FILE
Doc Date
7/8/2008
Doc Name
Cost Summary Form
From
DRMS
To
File
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.r <br />sheet 1 of 2 <br />Permit or other job action :New 112 <br />Task description : Backfill material into French drain <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck : Generic 10-12 <br />-Loader : CAT 950G hia <br />Support equipment -Load area <br />Shift basis : 1 per day <br />:ription <br />y, 6x4 <br />lift (2002) <br />-Dump area : Cat D7R DS Series 11 LGP - 7S <br />Road maintenance -Motor grader : NA <br />-Water truck : Water Tanker, 2,500 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer NA misctruk <br />% Utilization-machine : 100 28 NA 25 NA 10 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $12.32 $21.07 NA $45.54 NA $7.53 <br />Operating cost/hour : $43.87 $8.52 NA $15.01 NA $1.54 <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $24.14 $32.78 NA $32.78 NA $33.94 <br />Unit subtotals : $80.34 $62.38 NA $93.33 NA $43.01 <br />Number of units : 1 1 0 1 0 1 <br />Group subtotals : Work : $142.71 Support : $93.33 Maintenance: $43.01 <br />Total work team cost/hour : $279.06 <br />:. : .... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 800 LCY factor : NA volume : 800 LCY <br />Material weight : 2,550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Gravel - Dry Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 13.88 LCY Adjusted volume*: 12.00 - LCY <br /> Final truck volume based on number of loader passes : 9.84 LCY <br /> ' truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 5,100 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.: Loose material - 1"and over (85 - 90%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 3.281 LCY Net correction : 0.830 0.830
The URL can be used to link to this page
Your browser does not support the video tag.