Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 007 <br />Date : 0710312008 <br />User : DB2 <br />State : Colorado <br />County :Adams <br />Site :Priola <br />Permit/job #: M-2007-087 <br />Abbreviation :none <br />Filename :M087-007 <br />Agency or organization name: DRMS <br />Permit or other job action :New 112 <br />Task description : Excavate trench for french drain <br />HOURLY :EQUIPMENT COST <br />Machine description : Cat 320C <br />Horsepower: 138 <br /> Weight (MT) : 19.70 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $26.76 NA Shift basis : 1 per day <br />Operating cost/hour : $36.66 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $96.39 Total fleet cost/hour : $96.39 <br />.:. <br />MATERIAL <br />QUANTITIES <br />>:_ <br />Initial Swell Loose <br />volume : 800 LCY factor : NA volume : 800 LCY <br /> <br />Source of estimated volume: Estimated <br />Source of estimated swell factor : estimated <br /> <br />:..................................................................................................................................................... <br /> <br />O:DUCTION <br />HOURLY PR .......................................... <br />... <br />.............................. <br />Excavator Cycle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description : EXCELLENT <br />Secondary job condition within basic description : EXCELLENT <br />Cycle time value : 0.17 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 _LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 1.05 Moist loam or sandy clay (100% - 110%) <br />Adjusted bucket capacity : 1.71 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,100 feet Altitude adjustment : 0.90 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.75 multiplier