My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-17_PERMIT FILE - M2008027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008027
>
2008-07-17_PERMIT FILE - M2008027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:44 PM
Creation date
7/21/2008 4:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008027
IBM Index Class Name
PERMIT FILE
Doc Date
7/17/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
Tetra Tech, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task # : 06a State : Colorado Permit/job # : M-2008-027 <br />Date : 0711712008 County :Garfield Abbreviation : none <br />User : THM Site : Tepee Park Ranch Filename : M027-06a <br /> <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Initial mobilization to and from site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br /> <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 322C L 26.68 $34.40 $117.55 1 $151.95 $117.55 $0.00 <br />-CAT 924G 11.32 $15.06 $88.67 1 $103.73 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $255.68 $206.22 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.