Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $50.90 1 $50.90 $50.90 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $50.90 $50.90 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.34 0.34 <br />Return time (hours) = 0.34 0.34 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.69 0.69 <br />JOB TIME AND COST <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />Rffle Colorado <br />12.0 miles <br />35.0 mph <br />$828.09 <br />$34.90 <br />Total job time : 3.37 hours <br />Total job cost : $863