Laserfiche WebLink
October Ore Pile Reclamation <br />110(d) Limited Impact Permit Application <br />Nuvemco LLC <br />Exhibit D <br />6.3.4 (1)(e)Reclamation for any waste rock dumps, tailing impoundments, etc. <br />NA. None present in the October Ore Pile Reclamation area. Nearby preexisting <br />mining operations have all been reclaimed. <br />6.3.4 (2) Reclamation Costs <br />Reclamation costs will be limited to approximately 4 days of work by a front-end <br />loader with operator, and one support truck for fuel, ATV and portable seeder. During <br />the last few days of ore removal, the returning haul trucks will be loaded with silty soil at <br />the silt pile from John Brown Canyon. This silt will be stockpiled on a vacated portion of <br />the ore pile and redistributed over this disturbed area prior to seeding. <br />6.3.4 (2) (a)Eguipment Costs <br />Loader & Operator $125/hour x 10 hours x 4 days = $5000.00 <br />Support vehicle <br />and Operator$350/day x 4 days = $1400.00 <br />Seed mix and miscellaneous expenses = 300.00 <br />Total: = $6700.00 <br />6.3.4 (2) (b)Earthwork, demolition, fencing, etc. <br />None required. <br />6.3.4 (2) (c)Additional administrative costs <br />$6700 x 23.5% = $1574.5 <br />22