My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2007044 (7)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-07-11_PERMIT FILE - M2007044 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:32 PM
Creation date
7/17/2008 8:25:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
7/11/2008
Doc Name
Appendix J, K, and L (volume 2)
From
Energy Fuels Resources Corp
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soils. <br />1. ASTM D 4643 - Test Method for Determination of Water (Moisture) Content of Soil <br />by the Microwave Oven Method. <br />PART 2: PRODUCTS <br />2.01 FILL MATERIALS <br />A. Fill materials shall consist of Cushion Material, Squeegee Material, and Random Fill <br />as specified in Section 02205. <br />PART 3: EXECUTION <br />3.01 PREPARATION <br />A. Prepare subgrade according to Section 02211. <br />B. Do not place fill until subgrade has been tested and approved by the Owner. <br />3.02 FILL PLACEMENT <br />A. Do not place frozen material as fill, and do not place fill on frozen ground. <br />B. Imported material must be tested for compliance with the Specifications and the <br />results approved by the Owner prior to the material being delivered to the site. <br />C. Fill shall be placed to the designed lines and grades and according to these <br />Specifications. <br />D. If, in the opinion of the Owner, the surface of the prepared foundation or the rolled <br />surface of any layer of the fill in place is too wet for proper compaction of the layer <br />of fill material to be placed thereon, it shall be removed and allowed to dry or shall <br />be worked with discs, scarifier, or other equipment to reduce the moisture content to <br />the required amount, and then compacted before the next layer of fill material is <br />placed. <br />E. Fill shall be placed only after subgrades below fills have been adequately compacted <br />and approved by the Owner. <br />F. All fill materials shall be moisture-conditioned prior to applying compactive effort. <br />Moisture-conditioning may be performed to fill material either in the borrow area or <br />at the fill site or in both areas as directed by the Owner. <br />G. When material is too dry for proper compaction and/or is below the minimum <br />moisture content specified, the Owner shall spray water on the fill and work the <br />moisture into the fill by discing or scarifying or other approved means until a <br />uniform distribution of moisture is obtained. <br />0 H. The relative compaction of fill materials shall be tested in place to check compliance <br />to the Specifications. Relative compaction of soil materials, with less than 30 <br />percent rock greater than the 3/4-inch mesh size, is the ratio of the in-place dry <br />density of the constructed fill to the maximum laboratory dry density determined by <br />Revision A 02223-2 January 2008 <br />I: N1'IJ5-Onyadlinmi®_I I Ia-% ?hrp 222}Filling Rev A1.000
The URL can be used to link to this page
Your browser does not support the video tag.