Laserfiche WebLink
f. Insurance shall include provision providing notification to the State 10 days prior to <br /> cancellation of the coverage. <br /> Automobile Liability (Minimum). The contractor must carry a minimum of$600,000 combined <br /> single limit. <br /> VENDOR OFFSET <br /> Pursuant to C.R.S. 24-30-202.4 (as amended), the State Controller may withhold debts owed to <br /> state agencies under the vendor offset intercept system for: (a) unpaid child support debt or child <br /> support arrearages; (b) unpaid balance of tax, accrued interest, or other charges specified in <br /> Article 22, Title 39, C.R.S.; unpaid loans due to the student loan division of the Department of <br /> Higher Education; (d) owed amounts required to be paid to the unemployment compensation fund; <br /> and (e) other unpaid debts owing to the State or any agency thereof, the amount of which is found <br /> to be owing as a result of final agency determination or reduced to judgment as certified by the <br /> controller. <br /> Work Description <br /> The attached General Conditions for Purchase Orders and Purchase Order Terms and Conditions <br /> apply to all work. <br /> Project Overview <br /> The goal of this Project is to safeguard public health and welfare by accomplishing stabilization of <br /> a collapsing cribbing wall, and using the material behind the wall to close an abandoned <br /> underground mine, which is open. Generally, mine waste materials located behind and above the <br /> cribbing will be excavated, and removed to a disposal site located below the adjacent road. The <br /> mine waste material will be deposited in a manner which will prevent access to the underground <br /> mine opening. Non-coal earthen materials located at and adjacent to the disposal site will be used <br /> as a cover/topsoil for the mine waste. The excavation area and the disposal area will be <br /> revegetated. <br /> NOTE that volumes, distances and areas stated in this document are ESTIMATIONS ONLY. <br /> CONTRACTORS are responsible for verifying all estimations prior to bid submittal. <br /> WORK TASKS <br /> The tasks included in this Project are as follows: <br /> Task 1: Coal Mine Waste Excavation <br /> Task 2: Topsoil Salvage and Application <br /> Task 3: Final Grading <br /> Task 4: Revegetation <br /> Task 5: Equipment Rental <br /> Task 6: Scrap Removal <br /> 3 <br />