Laserfiche WebLink
stopped. The pump was then shut down for two hours. The pump was then <br />restarted; however there was no discharge. The packer was then deflated and <br />reinflated. Fluid was then pumped for 40 minutes. Fluid discharge stopped at <br />this time and the pump was shut down. The hole was allowed to recharge for 3 <br />hours at which time the pump was restarted. There was no discharge indicating <br />that there was insufficient permeability in the formation to allow flow of ground <br />water. <br />Table 1 presents the results of the laboratory analysis. Laboratory reports are <br />presented in Appendix B. <br />The boring was abandoned by placing a cement/bentonite slurry from 560 feet to <br />surface. <br /> <br /> <br />U.S. Environmental Services, Inc. 6