Laserfiche WebLink
proper sample attained. The field parameters were measured as follows: <br />Temperature 18.8° C <br />pH 8.5 units <br />Conductivity 485 pmhos <br />Packer test 1 was conducted over the interval 250 to 280 feet. The pump was <br />placed at 275 feet. Sixty gallons of water were pumped before the sample was <br />taken. Samples were prepared at the site and shipped to Barringer Laboratories <br />for analysis. The field parameters were measured as follows: <br />Temperature 15.6°C <br />pH 8.83 units <br />Conductivity 715 pmhos <br />Packer test 2 was conducted over the interval 355 to 400 feet. The pump was <br />placed at 385 feet. Sixty gallons of water were pumped before the sample was <br />taken. Samples were prepared at the site and shipped to Barringer Laboratories <br />for analysis. The field parameters were measured as follows: <br />Temperature 16.50 C <br />pH 8.58 units <br />Conductivity 696 pmhos <br />Packer test 3 test was conducted over the interval 395 to 440 feet. The pump was <br />placed at 425 feet. Sixty gallons of water were pumped before the sample was <br />taken. Samples were prepared at the site and shipped to Barringer Laboratories <br />for analysis. The field parameters were measured as follows: <br />Temperature 12.80 C <br />pH 8.55 units <br />Conductivity 714 pmhos <br />Packer test 4 test was conducted over the interval 500 to 560 feet. The pump was <br />placed at 550 feet. Fluid was pumped for 40 minutes at which time the discharge <br />U.S. Environmental Services, Inc. 5